Laserfiche WebLink
2026 thru 2030 <br />Capital Improvement Plan <br />Arden Hills, MN <br />Project # 26-W-003 <br />Project Name Trunk Water Main Condition Assessment <br />Total Project Cost <br />$40,000 <br />Type <br />Unassigned <br />Priority <br />2 Very Important <br />Useful Life <br />10 years <br />Department <br />Water Department <br />Category <br />Utility Maintenance <br />Status <br />Active <br />TCAAP <br />No <br />Description <br />Evaluated the condition of 16" water main between North and South towers to determine the degree of corrosion and deterioration in 2020-2021. The evaluation <br />will develop a long-term plan for rehabilitation of this critical water main segment. Inspection via ultrasonic testing is needed to evaluate existing conditions in <br />critical locations along the Trunk Watermain. <br />2026 - Evaluation at Hamline Ave. N. near Ingerson and Dunlap St. N. near Ingerson <br />2028 - Inspections and testing at Dunlap St. N. near Grey Fox Road <br />justification <br />The trunk water main extending between the <br />north and south elevated storage tanks is <br />one of the most <br />important and <br />critical segments <br />of the water <br />distribution <br />system for supplying water to the northern portion of the City. Segments of the water <br />main have been <br />in service for more than 52 years. <br />Expenditures <br />2026 <br />2027 <br />2028 <br />2029 <br />2030 <br />Total <br />Construction/Maintenance <br />20,000 <br />0 <br />20,000 <br />0 <br />0 <br />40,000 <br />Total 20,000 <br />0 <br />20,000 <br />0 <br />0 <br />40,000 <br />Funding Sources <br />2026 <br />2027 <br />2028 <br />2029 <br />2030 <br />Total <br />Water Utility Funds <br />20,000 <br />0 <br />20,000 <br />0 <br />0 <br />40,000 <br />Total 20,000 <br />0 <br />20,000 <br />0 <br />0 <br />40,000 <br />72 <br />Produced Using Plan -It CIP Software Page 68 / 73 <br />