My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-14-25-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
07-14-25-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2025 10:37:15 AM
Creation date
7/10/2025 4:56:22 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning Commission Meeting -Zoning and Subdivision Ordinance Revisions -Work Session #2 - April 9, 2025 <br />• Electric Vehicle (EV) Standards <br />Electric vehicles are an emerging transportation technology that has been driving demand for <br />more charging stations available to the public in recent years. Many cities are exploring <br />incorporating standards into their codes to allow or require developments to provide EV <br />charging stations. <br />There are a range of options for communities to explore when adding these standards to their <br />code. The spectrum typically starts with discretionary standards that generally allow EV <br />chargers with basic parameters. It can then increase to requiring certain types of uses to be EV <br />ready, which means requiring the installation of the electrical infrastructure for the eventual EV <br />charging station to be installed. The more prescriptive regulations can directly lead to requiring <br />the installation of EV charging stations; these standards often vary depending on the scale of <br />the use. It is also helpful to understand that there are different charger levels demonstrated by <br />the following graphic: trigger <br />AC Level One <br />- r�• <br />r�r <br />VOLTAGE <br />120v 1-Phase AC <br />AMPS <br />12-16 Amps <br />CHARGING LOADS <br />1.4 to 1.9 KW <br />CHARGE TIME FOR VEHICLE <br />3-5 Miles of Range Per Hour <br />AC Level Two <br />4wbo <br />VOLTAGE <br />208V or 240V 1-Phase AC <br />AMPS <br />12-80 Amps (Typ. 32 Amps) <br />CHARGING LOADS <br />2.5 to 19,2 kW (Typ. 7 kW) <br />CHARGE TIME FOR VEHICLE <br />10-20 Miles of Range Per Hour <br />DC Fast <br />Charge <br />VOLTAGE <br />208V or 480V 3-Phase AC <br />AMPS <br /><125 Amps (Typ. 60 Amps) <br />CHARGING LOADS <br /><90 kW (Typ. 50 kW) <br />CHARGE TIME FOR VEHICLE <br />80% Charge in 20-30 Minutes <br />Since Arden Hills is starting from scratch, HKGi recommends a combination approach for <br />residential and nonresidential uses that combines requirements for some EV charging stations <br />to be installed with those only requiring uses to be EV ready. The initial draft language is <br />proposed below. We will look to the Planning Commission to help determine if this is the <br />appropriate level of intervention or if there is a desire to increase or scale back the <br />requirements. <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.