2026 thru 2030 <br />Capital Improvement Plan <br />Arden Hills, MN <br />Project # <br />28-Str-001 <br />Project Name <br />2028 PIMP <br />Total Project Cost <br />$6,345,000 <br />Department <br />Street Department <br />Type <br />Improvement <br />Category <br />Streets: Reconstruction <br />Priority <br />2 Very Important <br />Status <br />Active <br />Useful Life <br />20 years <br />TCAAP <br />No <br />Description <br />Pavement Management Program (PMP) improvements consisting of spot curb repair, resurfacing as mill & overlay or full depth reclamation with new bituminous <br />pavement, repairs to storm sewer inlets, dredging Fernwood, Hunters and Benton ponds and adding grit chambers, repairs to sanitary sewer manholes and <br />castings, CIPP lining of existing clay pipe, watermain replacement within Benton Way neighborhood that affects the streets, hydrant and valve repairs. <br />Street segments include: Benton Way, Tiller Lane (Lexington to Cannon Ave), Cannon Ave (Tiller Ln to Dunlap), Dunlap (Cannon Ave to Tiller Lane), Pine Tree Dr, <br />Harriet Ave, Walden PI, Lametti Ln, Lametti Ct, Bussard Ct, Hunters Ct, Fernwood St, Dellwood Ave and Carlton Dr. <br />justification <br />Pavement conditions are showing distress with condition ratings from 15 to 59. Pavement conditions will continue to decline. Proposed improvements are <br />necessary to continue safe and reliable street and utility services. These improvements will address the increasing costs for patching and maintaining highly <br />deteriorated street pavement within the City, extensive large area patching was performed in 2022 by Public Works. Watermain within Benton Way neighborhood <br />consists of 58-year old cast iron pipe and has experienced several breaks in recent years, the goal will be to replace the segments that could impact the new road <br />surface. Pond dredging is overdue in several ponds within the project corridor, City staff has received feedback from residents to perform maintenance. CIPP <br />lining of the existing clay sanitary sewer pipe will prevent inflow and infiltration and root intrusion as well as extending the life of the pipe for 50+years. <br />Expenditures <br />2026 <br />2027 <br />2028 <br />2029 <br />2030 <br />Total <br />Construction/Maintenance <br />0 <br />0 <br />6,345,000 <br />0 <br />0 <br />6,345,000 <br />Total 0 <br />0 <br />6,345,000 <br />0 <br />0 <br />6,345,000 <br />Funding Sources <br />2026 <br />2027 <br />2028 <br />2029 <br />2030 <br />Total <br />Other <br />0 <br />0 <br />2,075,000 <br />0 <br />0 <br />2,075,000 <br />Surface Water Mgmt Utility Funds <br />0 <br />0 <br />1,410,000 <br />0 <br />0 <br />1,410,000 <br />Capital Improvement Funds (PIR) <br />0 <br />0 <br />1,280,000 <br />0 <br />0 <br />1,280,000 <br />Sanitary Sewer Utility Fund <br />0 <br />0 <br />620,000 <br />0 <br />0 <br />620,000 <br />State Aid <br />0 <br />0 <br />480,000 <br />0 <br />0 <br />480,000 <br />Water Utility Funds <br />0 <br />0 <br />480,000 <br />0 <br />0 <br />480,000 <br />Total 0 <br />0 <br />6,345,000 <br />0 <br />0 <br />6,345,000 <br />6 <br />Produced Using Plan -It CIP Software Page 2 / 73 <br />