VII. ESTIMATED COSTS
<br />Detailed estimates of probable construction costs have been prepared for the improvements
<br />described in this report and are included in Appendix B. All costs are based on anticipated unit
<br />prices for the 2026 construction season based on actual bid prices for similar projects. Actual costs
<br />will be determined through competitive bids following the final design for the project. All
<br />estimated costs also include a 10% contingency and 27% overhead allowance for legal,
<br />engineering, administrative, and finance costs. Table 2 below contains a summary of the
<br />estimated total project costs for the recommended base project improvements, inclusive of
<br />construction costs, contingency, and overhead allowance.
<br />Proposed
<br />Improvements
<br />Table
<br />Residential
<br />Mill &
<br />Overlay
<br />Areas
<br />2 — Estimated
<br />Residential
<br />Reclamation
<br />Areas
<br />Base Project
<br />Industrial
<br />Reclamation
<br />Areas
<br />Costs
<br />Trails &
<br />Retaining
<br />Wall
<br />Karth Lake
<br />Total
<br />Project
<br />Costs
<br />Streets
<br />$163,000
<br />$1,229,000
<br />$401,000
<br />-
<br />-
<br />$1,793,000
<br />Storm Sewer
<br />$55,000
<br />$148,000
<br />$13,000
<br />-
<br />-
<br />$216,000
<br />Sanitary Sewer
<br />$23,000
<br />$152,000
<br />$11,000
<br />-
<br />-
<br />$186,000
<br />Watermain
<br />$49,000
<br />$344,000
<br />$74,000
<br />-
<br />-
<br />$467,000
<br />Trails
<br />-
<br />-
<br />-
<br />$248,000
<br />-
<br />$248,000
<br />Karth Lake
<br />-
<br />-
<br />-
<br />-
<br />$179,000
<br />$179,000
<br />Total Project
<br />Costs
<br />$290,000
<br />$1,873,000
<br />$499,000
<br />$248,000
<br />$179,000
<br />$3,089,000
<br />One design alternate was evaluated as part of the preliminary design for the potential removal of
<br />accumulated sediment at five delta locations in Karth Lake. Also, three options were evaluated for
<br />improvements to the Karth Lake pump system to better monitor the lake level and possibly
<br />automate the pump operations. A summary of the estimated project costs associated with the
<br />design alternate and the estimated project costs associated with the three design options is
<br />presented in Table 3 below (includes 10% contingency and 27% overhead).
<br />Alternate Project
<br />Costs
<br />Proposed Improvements
<br />Karth Lake
<br />Total Construction Costs
<br />Alternate 1 - Karth Lake
<br />$575,000
<br />$575,000
<br />Sediment Removal
<br />Option 1— Karth Lake Pump
<br />$14,000
<br />$14,000
<br />System Improvements
<br />Option 2 — Karth Lake Pump
<br />$112,000
<br />$112,000
<br />System Improvements
<br />Option 3 — Karth Lake Pump
<br />$500,000+
<br />$500,000+
<br />System Improvements
<br />It is planned to bid the project with a bid alternate for the Karth Lake dredging work and the Karth
<br />Lake pump system improvements, if approved. This will allow flexibility to include or remove these
<br />work items from the project based on the actual prices bid by the contractor to complete the
<br />work.
<br />Prepared by: Bolton & Menk, Inc.
<br />2026 PMP Street & Utility Improvements 125X.137753
<br />ESTIMATED COSTS
<br />Page 17