Laserfiche WebLink
VII. ESTIMATED COSTS <br />Detailed estimates of probable construction costs have been prepared for the improvements <br />described in this report and are included in Appendix B. All costs are based on anticipated unit <br />prices for the 2026 construction season based on actual bid prices for similar projects. Actual costs <br />will be determined through competitive bids following the final design for the project. All <br />estimated costs also include a 10% contingency and 27% overhead allowance for legal, <br />engineering, administrative, and finance costs. Table 2 below contains a summary of the <br />estimated total project costs for the recommended base project improvements, inclusive of <br />construction costs, contingency, and overhead allowance. <br />Proposed <br />Improvements <br />Table <br />Residential <br />Mill & <br />Overlay <br />Areas <br />2 — Estimated <br />Residential <br />Reclamation <br />Areas <br />Base Project <br />Industrial <br />Reclamation <br />Areas <br />Costs <br />Trails & <br />Retaining <br />Wall <br />Karth Lake <br />Total <br />Project <br />Costs <br />Streets <br />$163,000 <br />$1,229,000 <br />$401,000 <br />- <br />- <br />$1,793,000 <br />Storm Sewer <br />$55,000 <br />$148,000 <br />$13,000 <br />- <br />- <br />$216,000 <br />Sanitary Sewer <br />$23,000 <br />$152,000 <br />$11,000 <br />- <br />- <br />$186,000 <br />Watermain <br />$49,000 <br />$344,000 <br />$74,000 <br />- <br />- <br />$467,000 <br />Trails <br />- <br />- <br />- <br />$248,000 <br />- <br />$248,000 <br />Karth Lake <br />- <br />- <br />- <br />- <br />$179,000 <br />$179,000 <br />Total Project <br />Costs <br />$290,000 <br />$1,873,000 <br />$499,000 <br />$248,000 <br />$179,000 <br />$3,089,000 <br />One design alternate was evaluated as part of the preliminary design for the potential removal of <br />accumulated sediment at five delta locations in Karth Lake. Also, three options were evaluated for <br />improvements to the Karth Lake pump system to better monitor the lake level and possibly <br />automate the pump operations. A summary of the estimated project costs associated with the <br />design alternate and the estimated project costs associated with the three design options is <br />presented in Table 3 below (includes 10% contingency and 27% overhead). <br />Alternate Project <br />Costs <br />Proposed Improvements <br />Karth Lake <br />Total Construction Costs <br />Alternate 1 - Karth Lake <br />$575,000 <br />$575,000 <br />Sediment Removal <br />Option 1— Karth Lake Pump <br />$14,000 <br />$14,000 <br />System Improvements <br />Option 2 — Karth Lake Pump <br />$112,000 <br />$112,000 <br />System Improvements <br />Option 3 — Karth Lake Pump <br />$500,000+ <br />$500,000+ <br />System Improvements <br />It is planned to bid the project with a bid alternate for the Karth Lake dredging work and the Karth <br />Lake pump system improvements, if approved. This will allow flexibility to include or remove these <br />work items from the project based on the actual prices bid by the contractor to complete the <br />work. <br />Prepared by: Bolton & Menk, Inc. <br />2026 PMP Street & Utility Improvements 125X.137753 <br />ESTIMATED COSTS <br />Page 17 <br />