My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-14-25-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
07-14-25-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2025 5:05:44 PM
Creation date
7/10/2025 4:59:19 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Industrial Reclamation Areas <br />70% Estimated Street Project Costs = $280,000 <br />Residential Equivalent Units = 334 (assumes 3 REU's per Acre) <br />Calculated Assessment Rate = $840 per REU <br />To ensure the calculations resulting from the application of the City's assessment policy are in line <br />with an appraiser's opinion of benefit to the properties in each improvement/zoning category, the <br />City enlisted the services of Nagell Appraisal & Consulting to conduct a general benefit appraisal <br />on the properties throughout each unique project area. The general benefit appraisals are <br />included in Appendix D. The general benefit appraisals resulted in a range of benefit values for <br />each improvement/zoning category, as indicated below: <br />Residential Mill & Overlay Areas <br />SF Residential Non -Lakefront Lot Benefit Appraisal Assessment Rate = $3,000 to $4,000 per REU <br />SF Residential Lakefront Lot Benefit Appraisal Assessment Rate = $4,000 to $5,000 per REU <br />Residential Reclamation Areas <br />SF Residential Non -Lakefront Lot Benefit Appraisal Assessment Rate = $8,000 to $10,000 per REU <br />SF Residential Lakefront Lot Benefit Appraisal Assessment Rate = $9,000 to $11,000 per REU <br />Industrial Reclamation Areas <br />Office/Industrial Benefit Appraisal Assessment Rate (up to 5 Acres) _ $0.15 to $0.25 per SF <br />Office/Industrial Benefit Appraisal Assessment Rate (exceeding 5 Acres) _ $0.02 to $0.05 per SF <br />Since the assessment rates calculated based on the City's assessment policy fell within or below <br />the assessment rate range for each improvement/zoning category, it is proposed to maintain the <br />assessment rates calculated based on the City's assessment policy for the project, or as directed <br />by the City Council. See Figure 2 through Figure 4 in Appendix A for the assessable properties map <br />that correlates with the parcel numbers on the preliminary assessment roll. <br />The project costs for the remaining street costs and for the storm sewer, sanitary sewer, <br />watermain, trails, and Karth Lake improvements will be the cost responsibility of the City. <br />Proposed project funding sources are a combination of the City's Permanent Improvements <br />Revolving (PIR) fund, utility funds, special assessments for street improvements, possible grant <br />funds if grant applications are successful, and the potential for KLID participation. <br />The proposed project assessments and funding summary are based on preliminary estimated <br />project costs for the recommended base project improvements. These costs may be revised at the <br />time of the final assessment hearing depending on the final design of the project, required right- <br />of-way and/or easements, soil conditions, bids received, and actual work performed. The <br />assessments are proposed to be assessed over a 10-year period at an interest rate to be set by the <br />City Council. <br />A summary of the funding breakdown, exclusive of design alternates/options and assuming the <br />total assessments amount is based on the calculated assessment rates, is presented in Table 4 <br />below. <br />Prepared by: Bolton & Menk, Inc. FUNDING & ASSESSMENTS <br />2026 PMP Street & Utility Improvements 125X.137753 Page 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.