My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 08-12-1991
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
1990-1999
>
1991
>
CC 08-12-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:12:06 PM
Creation date
11/9/2006 4:20:23 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Minutes of the Arden Hills Regular Council Meeting, 8-12-91 <br />Page 7 <br /> <br />lOVERS (Cont'd) Malone moved, seconded by Growe, to direct staff to <br />accumulate the necessary documentation establishing <br />=iteria for purchase of equipment that is interchangeable with the existing <br />equipment and a noncanpetitive item = follow the bidding process and <br />furthennore, that staff determine the trade-in = sale value of the equipment to <br />be replaced. Motion carried unani.Jrously. (3-0) <br /> <br />COUNCIL cnlMENTS <br /> <br />. <br /> <br />DRAFT RFP; <br />ARCRITECl'S <br /> <br />STATUS REPORl'; <br />WATER MEl'ERS <br /> <br />Clerk Administrat= Berger requested camments fran <br />Council regarding the draft RFP for ardJ.itectural firms. <br /> <br />Councilmember Growe requested a status report regarding <br />certification of water and flow meters <br /> <br />Public Works SUperintendent Winkel advised he has received infonnation and will <br />forward same to Council. <br /> <br />IMPOOVEMENTS ; <br />SNELLING AVENUE <br /> <br />Councilmember Mahowald questioned when construction is <br />scheduled to begin on N=th Snelling Avenue and if <br />residents would be notified. <br /> <br />Public W=ks SUperintendent Winkel stated the llrprovements should begin very <br />soon; the recent rain has delayed the construction. He noted construction would <br />begin on the south end of North Snelling and the city Engineer indicated a letter <br />would be sent to residents prior to construction. <br /> <br />. <br /> <br />MEI'ER CERl'IFICATION <br /> <br />Acting Mayor Malone questioned if the master meter <br />certification test infonnation is available at this time. <br /> <br />Public Works SUperintendent Winkel stated the information would be fo:r:warded to <br />Council. <br /> <br />CDUNI'Y ROAD F Acting May= Malone noted the County has painted the <br />SIGNS turn lanes on County Road F; questioned if the signs <br />for no right turns fran Snelling onto Valentine Avenue <br />and no left turns fran County Road F onto Valentine have been =dered. <br /> <br />Public W=ks SUperintendent winkel advised the signs are ordered and staff will <br />install the signs. <br /> <br />Malone advised that school roses should be exenpted and suggested the Sheriff's <br />Department be advised of the exelllJtion. He also suggested staff contact Mounds <br />view High School officials and request the students be notified of the signs <br />prohibiting turns onto Valentine Avenue. <br /> <br />There was discussion relative to =dering a smaller sign to be attached to the <br />signs prohibiting turns whidJ. exelllJts school roses. <br /> <br />. <br /> <br />FINANCE <nmTl'EE <br />RE:CCM1ENDATIONS; <br />SIREEI' LIGHITNG <br /> <br />PONDING AREA; <br />LEXINGION AVE. & <br />HIGHWAY 96 <br /> <br />Acting Mayor Malone advised that the Finance Conunittee <br />recommendations f= street lighting were drafted several <br />months ago; suggested staff review committee minutes and <br />fo:r:ward same to the Public SafetyjWorks Conunittee. <br /> <br />Acting Mayor Malone questioned if the pond at Lexington <br />Avenue and Highway 96 is experiencing a blOCkage and if <br />staff has contacted the proper auth=ity to remedy this <br />problem. <br />
The URL can be used to link to this page
Your browser does not support the video tag.