My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 04-27-1992
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
1990-1999
>
1992
>
CC 04-27-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:12:10 PM
Creation date
11/9/2006 4:32:34 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />Ar~eD !Iills co~nci: <br /> <br />9 <br /> <br />April <br /> <br />~., <br />"-; { <br /> <br />1992 <br /> <br />Dick Foster, 4527 Keithson D~ive: If the easements on the <br />Reiling property would have been dedicated la~d as it should <br />have been in the first place, the~e would not be the staff, <br />attorney and engineering costs now. <br /> <br />Kurt Lawrence, 4516 Keithson Drive: What will tte pond area <br />look like when completed? Will it be aesthetical:y <br />pleasing? will the weir be a safe~y haza~d? <br /> <br />Graham explained that the function of the po~~ lS to serve <br />as wetland preservation, it will be graded pe~ Ric~ Creek <br />watershed D~strict standards, erosion control meas~res will <br />be put in place and some trees will nee~ to be removed. He <br />explained t~at t~e pond will have a baffled weir to hold the <br />water level to a certain elevation and anything over that <br />elevation will flow through an outlet into the Reiling <br />property. He described the weir and assured that there <br />would be a gliards at both ends of the pipe to elimi~ate t~e <br />possibility of a child or animal crawliL9 into the pipe. <br /> <br />. <br /> <br />Mark Magers, 4521 Keithson Drive: what is Rice C~eek <br />watershed District's inv01vemen~ i~ this project? When will <br />bids be taken if plans are approved tonight? <br /> <br />G~ata~ reported that RCWD is in the process of reviewing the <br />pla~s and he expects they will approve t~emt but they ~ave <br />not committed to contributing to the project. Maurer said <br />the schedule allows about three months in ~hich to ~eceive <br />bids. <br /> <br />Tor.:L Tr'ecal, 4:.21 Keithson Drive: <br />~~~eatened to sue past engineers <br />Is this stalling the project? <br /> <br />Mr. Rei 1 Lng has <br />involved in this situation. <br /> <br />Fi:la said that the City is looki~g into the possibility 0: <br />assigning responsibility. He added that Mr. Reiling is not <br />stalling the project, that negotiations are proceeding. <br /> <br />The public hearing was closed at 9:35 p.m. <br /> <br />councilmember Malone commented that clearly this project <br />must be done. He info~med the audienC0 that aL assesz~ent <br />hea~ing will take place at some future time when all the <br />necessary cost information is received. <br /> <br />. <br /> <br />CClune: 1 membet" Mahowald asked how soon the pro je.ct co.c.~ d <br />begin. Maurer stated that sta~t date d~pends upon <br />res01~tio~ of the acquisiticn issue; Filla anticipated ~t <br />~ay be possible to begin the project as soon as mid-~ay. <br />
The URL can be used to link to this page
Your browser does not support the video tag.