Laserfiche WebLink
<br /> . Arden Hills Council 4 November 29, 1993 <br /> Councilmember Probst commented that in effect this is a <br /> request to vacate an easement that doesn't exist. <br /> Fritsinger concurred. <br /> MOTION: Malone moved, seconded by Hicks to approve the vacation <br /> of easement for the area legally described as Shorewood <br /> Hills No. 6 addition, Lots 2 through 7 for James Hanton <br /> at 3945 Rolling Hills Road (Case #93-25) and secondly <br /> to approve Resolution #93-56, vacating Shorewood Hills <br /> No. 6 utility Easement. <br /> Motion carried unanimously (5-0) . <br /> CASE #93-22 SITE PLAN REVIEW & <br /> AMENDMENT TO SPECIAL USE PERMIT <br /> PRESBYTERIAN HOMES <br /> Community Planning Coordinator Fritsinger stated that <br /> Presbyterian Homes is requesting an amendment to the Special <br /> Use Permit for proposed site plan changes at Presbyterian <br /> Homes. A site Plan Review is also required for these <br /> proposed changes. <br /> . Fritsinger reported that the Planning commission reviewed <br /> this case at their October 6, 1993 meeting and there were <br /> several residents who voiced their concerns on various <br /> issues. The Planning commission tabled the request to allow <br /> the applicant of Presbyterian Homes to meet with the <br /> residents in the area to reach agreeable resolutions to <br /> these issues prior to any recommendation. <br /> Fritsinger further reported that the applicant held a <br /> meeting with the residents to address their concerns and the <br /> applicant was able to resolve the issues with the neighbors. <br /> Mr. Fritsinger outlined the changes made by the applicant in <br /> the response to the neighbors concerns. <br /> The representatives of Presbyterian Homes agreed that no <br /> deliveries would be accepted before 7:30 am. A new policy <br /> has also been initiated that any garbage needing to be taken <br /> to the dumpster in the evenings will remain inside the <br /> building and will not be taken to the dumpster until the <br /> next morning. Pistons have been installed in the garbage <br /> dumpsters and the recycling dumpsters will be equipped with <br /> plastic lids rather than metal lids. <br /> . <br />