Laserfiche WebLink
2026 thru 2030 <br />Capital Improvement Plan <br />Arden Hllls, MN <br />Project # 26-W-003 <br />Project Name Trunk Water Main Condition Assessment <br />Total Project Cost <br />$40,000 <br />Type <br />Unassigned <br />Priority <br />2 Very Important <br />Useful Life <br />10 years <br />Department Water Department <br />Category Utility Maintenance <br />Status Active <br />TCAAP No <br />Description <br />Evaluated the condition of 16" water main between North and South towers to determine the degree of corrosion and deterioration in 2020.2021. The evaluation <br />will develop a long-term plan for rehabilitation of this critical water main segment. Inspection via ultrasonic testing is needed to evaluate existing conditions in <br />critical locations along the Trunk Watermain. <br />2026 - Evaluation at Hamline Ave. N. near Ingerson and Dunlap St. N. near Ingerson <br />2028 - Inspections and testing at Dunlap St. N. near Grey Fox Road <br />Justification <br />The trunk water main extending between the north and south elevated storage tanks is one of the most important and critical segments of the water distribution <br />system for supplying water to the northern portion of the City. Segments of the water main have been in service for more than 52 years. <br />Expenditures 2026 2027 2028 2029 2030 Total <br />Construction/Maintenance 20,000 0 20,000 0 0 40,000 <br />Total 20,000 <br />0 <br />20,000 <br />0 <br />0 <br />40,000 <br />Funding Sources 2026 <br />2027 <br />2028 <br />2029 <br />2030 <br />Total <br />Water Utility Funds 20,000 <br />0 <br />20,000 <br />0 <br />0 <br />40,000 <br />Total 20,000 <br />0 <br />20,000 <br />0 <br />0 <br />40,000 <br />72 <br />Produced Using Plan -It CIP Software Page 68 / 73 <br />