Laserfiche WebLink
RESERVE <br />ADVISORS <br />Priority/Criticality: Per Management discretion <br />Expenditure Detail Notes: Expenditure timing and costs are depicted in the Reserve <br />Expenditures table in Section 3. <br />Roofs, Built-up <br />Line Item: 1.300 <br />Quantity: Approximately 8,720 square feet <br />History: The roof sections are primarily original with approximately 2,200 square feet <br />having been replaced in 2015. The building conducts inspections of the roofs annually. <br />We concur with this preventive maintenance practice and recommend the building <br />continue to fund these inspections through the operating budget. <br />Condition: We were unable to inspect the roof sections due to a lack of access. <br />Management reports a reoccurring leak at an isolated location during rainfall. <br />Built-up roof overview Roof perimeter flashing <br />Roof parapet flashing <br />Page 4.3 - Reserve Component Detail <br />