Laserfiche WebLink
RESERVE <br />ADVISORS <br />o Verify vent is unobstructed <br />o Conduct boiler blowdown to minimize corrosion and remove <br />suspended solids in system <br />o Clean pilot and burner assemblies <br />• Monthly: <br />o Check water and pressure levels <br />o Check controls and switches for proper operating <br />o Check and inspect condensate drain <br />o Check all gaskets for tight sealing <br />• Annually: <br />o Conduct full inspection of burners and flues <br />o Clean and inspect tubes to reduce scaling <br />o Inspect any pressure relief valves <br />o Clean and recondition feed water pumps <br />o Inspect electrical terminals and controls <br />o Seal doors/access panels <br />o Adjust air/fuel ratios as needed <br />Priority/Criticality: Defer only upon opinion of independent professional or engineer <br />Expenditure Detail Notes: Expenditure timing and costs are depicted in the Reserve <br />Expenditures table in Section 3. Our estimate of cost includes an allowance for <br />replacement of the controls. <br />Condensinq Units <br />Line Item: 3.240 <br />Quantity: Three Trane air-cooled condensing units with cooling capacities that range <br />from 10- to 25-tons <br />History: The 25-ton unit dates to 2020, and the 10-ton units date to 2021 <br />Condition: Reported satisfactory <br />Page 4.23 - Reserve Component Detail <br />