My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-28-25-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
07-28-25-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2025 10:59:14 AM
Creation date
8/7/2025 10:49:42 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESERVE <br />ADVISORS <br />MASONRY RETAINING WALL DETAIL <br />Cap Unit <br />Drainage Fill <br />Modular Blocks <br />Drain Pipes <br />Geosynthetic <br />Reinforcement <br />Retained Backfill <br />Reinforced Backfill <br />Excavation Line <br />Footing <br />© Reserve Advisors <br />Preventative Maintenance Notes: We note the following select recommended <br />preventative maintenance activities to maximize the remaining useful life: <br />• Annually: <br />o Inspect and repair leaning sections or damaged areas <br />o Water stains which may indicate possible blocked drainage <br />should be investigated further <br />o Inspect and repair erosion at the wall base and backside <br />Priority/Criticality: Defer only upon opinion of independent professional or engineer <br />Expenditure Detail Notes: Expenditure timing and costs are depicted in the Reserve <br />Expenditures table in Section 3. <br />Reserve Study Update <br />An ongoing review by Management and an Update of this Reserve Study are <br />necessary to ensure an equitable funding plan since a Reserve Study is a snapshot in <br />time. Many variables change after the study is conducted that may result in significant <br />overfunding or underfunding the reserve account. Variables that may affect the <br />Reserve Funding Plan include, but are not limited to: <br />• Deferred or accelerated capital projects based on Management discretion <br />• Changes in the interest rates on reserve investments <br />• Changes in the local construction inflation rate <br />Page 4.39 - Reserve Component Detail <br />
The URL can be used to link to this page
Your browser does not support the video tag.