Laserfiche WebLink
Repair catch basins along Snelling Ave 120 FTE Labor Hours required; 3 FTEs required High Priority. as <br />called out on the below map. This is a carryover from 2024 and prioritized for spring of 2025 prior to JPA <br />street maintenance. This work may conflict with the proposed trail improvements on the west side of <br />Snelling Ave N. related to the North Heights Apartments development. Coordination will be necessary. <br />Work on the east side of Snelling Ave can still take place prior to JPA work, ideally. <br />RoaC*3y starling 10'all; tl7 <br />r^gs and patcn: Invert <br />reeds mud, XONTRACT <br />WORK', <br />Roadway starting t0 Tall; itt <br />r,gs and patcn; <br />iCONTRACT WORK, <br />C <br />KEI,,THS <br />a= •:ra: <br />"Opp <br />UU <br />ZDt dean Out wm <br />v <br />add rorac antl � �� <br />aorc; remove <br />Drusn antl :IEEE, � ` <br />till needs ro oe <br />ada npraD and W I6peced <br />t3Dnd; remove <br />Drusn and lees; <br />e In'.pR dEs7d)'etl 3ftl reetl6 <br />w Ort; .UrO 0rdter and needs <br />reC4acement touts up <br />bu <br />Du[readnea0 on east 4tle of old <br />Iraert (CONTRACT WORK) <br />1i,,,. PW Storm Sewer Maint - 2024 ;`- <br />m <br />32 <br />