My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-11-25-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
08-11-25-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2025 7:59:45 AM
Creation date
8/8/2025 7:52:43 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Repair catch basins along Snelling Ave 120 FTE Labor Hours required; 3 FTEs required High Priority. as <br />called out on the below map. This is a carryover from 2024 and prioritized for spring of 2025 prior to JPA <br />street maintenance. This work may conflict with the proposed trail improvements on the west side of <br />Snelling Ave N. related to the North Heights Apartments development. Coordination will be necessary. <br />Work on the east side of Snelling Ave can still take place prior to JPA work, ideally. <br />RoaC*3y starling 10'all; tl7 <br />r^gs and patcn: Invert <br />reeds mud, XONTRACT <br />WORK', <br />Roadway starting t0 Tall; itt <br />r,gs and patcn; <br />iCONTRACT WORK, <br />C <br />KEI,,THS <br />a= •:ra: <br />"Opp <br />UU <br />ZDt dean Out wm <br />v <br />add rorac antl � �� <br />aorc; remove <br />Drusn antl :IEEE, � ` <br />till needs ro oe <br />ada npraD and W I6peced <br />t3Dnd; remove <br />Drusn and lees; <br />e In'.pR dEs7d)'etl 3ftl reetl6 <br />w Ort; .UrO 0rdter and needs <br />reC4acement touts up <br />bu <br />Du[readnea0 on east 4tle of old <br />Iraert (CONTRACT WORK) <br />1i,,,. PW Storm Sewer Maint - 2024 ;`- <br />m <br />32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.