and add hprap <br />locate and expose <br />missing structure <br />Surface water field inspection maps aid PW in completing the maintenance work in an organized <br />fashion. The maps below include the inspection results gathered in 2024 and are the proposed work <br />plan for surface water maintenance to be completed in 2025. The estimated PW Staffing and labor <br />hours are noted for each map below. <br />televise sic <br />UI deanln,n— sediment <br />clean and review for <br />sump installation <br />nem.e brush; <br />ladd nprap <br />-Z in mdeha and <br />n rap_ <br />24 CMP <br />e-111 '.""'Y Policy for <br />place an mh lid <br />review <br />this ditch I <br />plan rehab <br />project for this <br />01 <br />area <br />L I <br />------------------------------------------------------------------ -- --- - - - - <br />*AP <br />�kDEN H PW Storm Sewer Maint - 2025 <br />240 FTE Labor Hours required; 3 FTEs required High Priority. <br />34 <br />