Laserfiche WebLink
Citywide Watermain Condition Assessment — Public Works and the Engineering departments need to <br />create a citywide watermain management plan to assist in future project planning, budgeting and to be <br />proactive in preventing watermain breaks which results in loss of service to the residents. <br />Hydrant Assessment 160 FTE labor hours required, 2 FTEs required, medium priority. <br />PW will target corroded hydrants with paint failure. Hydrant coating assessment will be done during <br />2025 hydrant servicing within the blue highlighted area and added to the 2026 PW Annual Work Plan. <br />WJ <br />