Laserfiche WebLink
Lift Station 5 Forcemain and Valve Vault Improvements 80 FTE labor hours required, 2 FTEs required, <br />high priority. Staff worked with Bolton & Menk in 2024 to design construction for the replacement and <br />rerouting of the forcemain for lift station 5. The new location will follow County Rd E west to the Elmer <br />L. Anderson Memorial Trail and discharge into a rebuilt manhole at Stowe Ave and New Brighten Rd. The <br />construction is scheduled for 2025. <br />Lift Station 1 and 9 Improvements 40 FTE labor hours required, 2 FTEs required, high priority. <br />The lift station improvements include pump replacement, guide rails, wet well plumbing, and floats/ <br />transducer replacement. Inspections will be conducted in 2025 for needs and budgeting. Construction of <br />improvements is programmed for 2027. (Proposals for LS 1 and LS 9 rehab are due by June 11 ) <br />Forcemain Condition Assessment <br />An evaluation of all lift station forcemains is needed to determine future improvements needs and <br />budgeting. <br />Mainline Tree Root Treatment <br />We will be combining a small list from 2025 with the 2026 list for a contractor to complete chemical root <br />treatment. This process aids in tree root growth, stunting the growth for a period of time. In addition, <br />our crew saves time by reducing the need to hydraulically cut the roots from the pipes. <br />59 <br />