My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-11-25-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
08-11-25-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2025 7:59:45 AM
Creation date
8/8/2025 7:52:43 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table of Contents <br />Parks Maintenance Plan <br />(Parks Estimated FTE Labor Hours= 9,950) <br />Streets Maintenance Plan <br />(Streets Estimated FTE Labor Hours= 2,144) <br />"Does not include Emergency Operations" <br />Surface Water Maintenance Plan <br />(Surface Water Estimated FTE Labor Hours= 2,290) <br />Water Distribution Maintenance Plan <br />(Water Distribution Estimated Labor Hours= 3,013) <br />"Does not include Emergency Operations" <br />Sanitary Sewer Maintenance Plan <br />(Sanitary Sewer Estimated Labor Hours= 2,420) <br />"Does not include Emergency Operations" <br />Total 2025 PWMP Estimated Labor Hours = 19,817 <br />2-19 <br />20 — 26 <br />27-38 <br />39-51 <br />52-60 <br />There are four types of labor resources utilized by the Public Works Department and referenced <br />throughout the 2025 Public Works Maintenance Plan. Listed below are those resource types and the <br />abbreviation for each: <br />• Full-time Public Works staff (FTE) <br />• Seasonal part-time staff (SPT) <br />• Institution Community Work Crews (ICWC) <br />• Volunteer organizations, groups and/or individuals (VOL) <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.