Laserfiche WebLink
Snow Plowing Operations for Trails 320 FTE labor hours estimated per event; 2 FTEs required; high <br />priority. <br />The map, shown below, is for snowplow Route 4 which includes park system trails and street -side <br />sidewalks. The operator for this route also plows and salts the City Hall parking lot and sidewalks. When <br />a full citywide plow event takes place, Route 4 is completed alongside the street routes when Public <br />Works is fully staffed. <br />TRAIL PLOW ROUTES (4) <br />N'+F <br />•-Truck Priority (7:00am)—Truck <br />s <br />®Tool Cat 0 1.250 2.500 5.000 <br />FNt <br />4 <br />