My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-11-25-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
08-11-25-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2025 7:59:45 AM
Creation date
8/8/2025 7:52:43 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Softball Infield Grading and Maintenance 180 FTE labor hours required; 1 FTEs required high priority. <br />This work will be completed in the spring, summer, and fall timeframe by FTE's and SPT staff. Field <br />lighting, fencing, dugouts, bases, base boxes, trash/recycling receptacles and field signage will be <br />inspected and repaired as needed. Ongoing maintenance, field preparation, prior to practices and <br />games, is completed by SPT Staff. The park locations and number of fields are -listed below. Ongoing <br />maintenance and field prep, per the recreations schedule, continues throughout spring, summer, and <br />fall. <br />• Cummings Park (1 field) <br />• Royal Park (1 field) <br />• Floral Park (1 field) <br />• Perry Park (3 fields) <br />• Hazelnut Park (1 field) <br />Athletic Field Striping and Setup 180 FTE labor hours required; 1 FTEs required high priority. <br />Field striping and setup is completed for soccer and softball fields at the parks listed below throughout <br />the spring, summer, and fall. This work includes the initial field layout and soccer goal setup completed <br />by FTE's. <br />• Royal Park (foul lines) <br />• Cummings Park (foul lines, 2 adult soccer fields, 1 youth soccer field) <br />• Floral Park (foul lines) <br />• Perry Parks (foul lines, 3 fields) <br />• Hazelnut Park (foul lines, 2 adult soccer fields) <br />• Valentine Hills Elementary (running track) <br />Floral Park Ball Field Drain Tile Improvements 10 FTE labor hours required; 1 FTEs required Low <br />priority. <br />Create a plan for installation and determine budget amount to be considered for the 2026 budget. <br />***Note, this needs to be determined by July 315T.*** <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.