My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 02-26-1996
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
1990-1999
>
1996
>
CC 02-26-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:12:22 PM
Creation date
11/10/2006 2:48:00 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />Ie <br />I <br />I <br />I <br />. <br />I <br />. <br />.e <br />I <br />I <br />. <br />I <br />I <br />. <br />I <br />Ie <br />I <br /> <br />ARDEN HILLS CITY COUNCIL - FEBRUARY 26. 1996 <br /> <br />7 <br /> <br />the loss of their "country" atmosphere with concrete curb installation, and possible loss of the <br />cul-de-sac. Mr. Stonehouse stated he recommends complete reconstruction of Oak Avenue as <br />well. <br /> <br />Mr. Stonehouse stated that drainage is the greatest concern for Ridgewood Court residents, and <br />additional correction beyond an overlay may be necessary. <br /> <br />Mr. Stonehouse noted that no residents were present at the McCracken Lane information <br />meeting, and cold-in-place recycling with edge drain installation should provide an adequate <br />solution. <br /> <br />Mr. Stonehouse noted that Eide Circle residents' greatest concern was flat driveways into the <br />street resulting in some potential drainage problems, as well as access [TOm Hamline Avenue. <br /> <br />Councilmember Malone inquired if Ridgewood Court water flow could be corrected by storm <br />sewer. Mr. Stonehouse replied that it could, with a cost of between $3,000 and $16,000. <br /> <br />Councilmember Malone inquired if Oak A venue was originally constructed over a dirt path with <br />Class five and then blacktop. Mr. Stonehouse replied that it was difficult to tell, but it could be a <br />nine-inch Class five with a base bituminous overlay, or it could be a gravel road overlaid. <br /> <br />Councilmember Malone inquired if there is water under the street. Mr. Stonehouse replied that <br />there was, and when it freezes the street heaves. Councilmember Malone stated the long-term <br />effect of water under a street is for the street to be destroyed. <br /> <br />Councilmember Malone inquired if the residents want the surmountable curb. Mr. Stonehouse <br />replied that some residents do, but not all. He continued that surmountable curbs do not contain <br />traffic as well, allow snowplows to damage lawns, and do not solve any drainage problems. <br /> <br />Councilmember Malone inquired how Pascal Avenue would be reconstructed. Mr. Stonehouse <br />replied that after their preliminary analysis, they would recommend raising the north end of the <br />street approximately one foot so it would drain south into County Road E. <br /> <br />Mayor Probst inquired how much drainage comes from Pascal Avenue. Mr. Stonehouse replied <br />it was between 30 and 60 percent. <br /> <br />Mayor Probst inquired what the issue was with the cul-de-sac on Oak Avenue. Mr. Stonehouse <br />stated that school buses currently turn around in the "T" portion of the street west of the <br />intersection. He said it is feasible to continue this practice, but is a safety issue. <br />
The URL can be used to link to this page
Your browser does not support the video tag.