My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 07-08-1996
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
1990-1999
>
1996
>
CC 07-08-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:12:23 PM
Creation date
11/10/2006 2:48:08 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />.. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />.. <br />I <br />I <br />I <br />I <br />I <br />I <br />I. <br />I <br />I <br /> <br />ARDEN HILLS CITY COUNCIL - JULY 8. 1996 <br /> <br />12 <br /> <br />John Grove, Vice President of Buchen Environmental Services, Inc., advised the curing rate of <br />the resin is approximately two hours and the sewer line may need to be temporarily blocked off, <br />depending on the flow and depth of the sewer. If possible, sewage can be diverted and rerouted <br />during that time, He then explained how service laterals are accommodated. <br /> <br />MOTION: <br /> <br />Malone moved and Aplikowski seconded a motion to authorize the hiring of <br />Buchen Environmental Services, Chaska, Minnesota, to conduct the repairs to the <br />Oak Avenue sanitary sewer at a cost not to exceed $17,535. The motion carried <br />unanimously (4-0). <br /> <br />D. Change Order No.1 for 1996 Street Improvement Project <br /> <br />Mr. Statford advised that Pine Tree Drive is one of the streets scheduled for an overlay in the <br />1996 Street Improvement Plan. However, Ramsey County has indicated there may be a conflict <br />at the intersection of Pine Tree Drive and County Road E in that the new overlay will not match <br />the existing pavement on County Road E or the existing curb at the edge of Pine Tree Drive. <br />Therefore, it is necessary to mill a portion of the existing bitwninous surface to a depth of <br />approximately I Yz inches. The concern is that the loop detectors which control the semaphores at <br />this intersection are typically buried only I Yz to 2 y, inches in the pavement and milling this area <br />could damage or completely destroy the existing detectors. <br /> <br />Mr. Stafford stated the Public Works Department recommends the Council approve Change <br />Order #1 appropriating $7,317.40 for the replacement of the loop detectors, if necessary, and that <br />the City Engineer be directed to take all precautions possible to protect and save the existing loop <br />detectors, thereby saving any repair or replacement costs. <br /> <br />MOTION: <br /> <br />Hicks moved and Malone seconded a motion to approve Change Order No. I in <br />the amount of$7,317.40 for the 1996 Street Improvement Project, as presented. <br />The motion carried unanimously (4-0). <br /> <br />ADMINISTRATOR COMMENTS <br /> <br />Mr. Fritsinger advised staff has mailed the RFQ for City Hall professional services to about 25 <br />firms and due to the delay in preparation, extended the time period for submittal by one <br />additional week. <br />
The URL can be used to link to this page
Your browser does not support the video tag.