Laserfiche WebLink
<br /> I <br /> I ARDEN HILLS CITY COUNCIL WORKSESS10N - OCTOBER 2 I. 1996 3 <br /> t' <br /> Staff was directed to work with Mayor Probst in development of a more complete <br /> I proposal and a list of pending items for further Council consideration and <br /> Committee volunteer discussion by the November, 1996 Council Worksession. <br /> Mayor Probst stated it was his intent to exclude the Park & Rec. Committee and <br /> I the Planning Commissions from any restructuring at this time. <br /> I Councilmember Keim left the meeting at 5: I 0 p.m. <br /> b. Building Inspection Sen>ices - 1997 <br /> I City Administrator Fritsinger reviewed the proposed creation of a full-time <br /> Building Inspector position for the City of Arden l-Iills, with formal action to be <br /> initiated at the October 28, 1996 Council meeting. Mr. Fritsinger reviewed <br /> I existing outside consulting services, addressing significant cost-savings to the <br /> City and increased customer service. The contracts of Dave Kriesel, current <br /> contracted Building Inspector, and Gene Pakoy, both require a 60-day notice of <br /> I termination. <br /> It was the consensus of the Council that the cost-savings for the position could <br /> -Ie serve as a bridge for a future phase-out of the position if deemed necessary as <br /> building permits decline, depending on the availability of future development <br /> I properties. <br /> Following further discussion, staff was directed to include creation ofa Building <br /> I Inspector position on the October 28, 1996 Council Agenda, with additional fine- <br /> tuning of the draft job description for inclusion oflegal requirements. <br /> I a. City Hall Facility - Review of Options <br /> City Administrator Fritsinger provided a summary ofthe City Hall project based <br /> on the origination of the project from the formation ofthe City Hall Committee in <br /> I January of 1990 to present. <br /> Issues discussed included the 1991 Community Survey results, review of possible <br /> I building sites, needs assessment report completed in 199 I by the City Hall <br /> Committee, 1992 architectural services enlisted, City Hall design issues, 1992 <br /> Bond Referendum regarding the proposed construction of a Public Works <br /> I building, TCAAP site selection and Reuse Plan process, temporary City facilities, <br /> City Hall relocation/renovation, 1996 architectural services requested, and other <br /> items. <br /> I Mr. Fritsinger asked for Council direction to staff as to its intentions for future <br /> t' City Hall facilities, and specifically how it wishes to proceed with the Request for <br /> Proposals for architectural services. Specifically, Mr. Fritsinger asked for <br /> clarification on where we're at, and how to proceed. <br /> I <br />