My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-22-25-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
09-22-25-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 4:50:33 PM
Creation date
9/22/2025 4:49:27 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 12 <br /> <br />The remainder of this memo is not new content and was provided to Council in the <br />September 8, 2025 memo. <br /> <br />Council directed Staff to include a $10,000 placeholder starting in 2026 and forward, for future <br />construction costs related to the Parks Master Plan, which has been incorporated into the proposed <br />budget. <br /> <br />Public Safety Fund <br />Additional changes were made to the Public Safety Capital Equipm ent Fund based on the latest <br />preliminary estimates from the Lake Johanna Fire Department (Attachment C, pages 21-23): <br /> Public Safety Capital Equipment. ($247,957) Change in Fund Balance <br />o Expense. Addition of command vehicle replacements in 2031 and 2033, including <br />an engine/ladder replacement programmed in 2032 ($247,957). The levy reserve <br />bank and corresponding transfer to the General Fund is based on 9 new FTEs (6 <br />fire captains and 3 firefighters). <br /> <br />Equipment/Building Replacement Fund <br />Council also directed staff to incorporate the below changes to the Equipment/Building <br />Replacement Fund: <br /> Equipment/Building Replacement. $0 Change in Fund Balance <br />o Expense. Delayed the 1993 Case 621 Loader to 2027 and delayed the 2013 Ford <br />Escape to 2027. No Fund Balance impact. <br />Staff will bring forward an equipment replacement plan to Council in March 2026. This <br />plan will feature a leveled cost structure for further discussion. <br /> <br />Background – Tree Preservation and Landscaping Fund <br />Due to the strong demand and positive feedback around the 2025 Tree Trust Partnership pilot <br />program, Tree Trust has asked the City to continue its tree sale partnership, which promotes <br />environmental sustainability. The 2026 cost is estimated to be $6,750. Council’s consensus at the <br />August 25, 2025 Special Work Session supports the continuation to partner with Tree Trust, and <br />funding to come from the Tree Preservation and Landscaping Fund. <br /> <br />Background – General Fund Budget <br />Annually, City staff prepares and submits a preliminary budget to the City Council for review and <br />feedback. Attached to this memo is the City’s preliminary General Fund budget for the 2026 fiscal <br />year. Each department provided their respective forecasts for this budget. <br /> <br />The proposed 2026 budget is $7,518,589, an increase of $757,310 or 11.2%. For the purpose of <br />this discussion, there is a 15.0% or $906,103 tax levy increase reflected in the budget, of which <br />$754,103 for the General Fund, $100,000 for the EDA Fund, and $52,000 for the Public Safety <br />Capital Fund. As presented, the General Fund Budget is underfunded by $122,009, which is the <br />budget shortfall projected in the 2025 budget. This practice is not sustainable in the long term. A <br />tax levy increase of 17.1% or $1,028,112 would be needed to balance the budget in 2026. <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.