Laserfiche WebLink
BRAUN Project Proposal <br />INTERTEC QTB221496 <br />the science you build on City of Arden Hills 2028 Pavement Management Project <br />Client: <br />City of Arden Hills <br />David Swearingen <br />1245 W Hwy 96 <br />Arden Hills, MN 55112 <br />(651)792-7800 <br />Work Site Address: <br />Various Streets <br />Arden Hills, MN 55112 <br />Service Description: <br />Geotechnical Evaluation, Pavement Coring, <br />Ground Penetrating Radar <br />Description <br />Quantity Units <br />Unit Price <br />Extension <br />Phase 1 <br />Geotechnical Evaluation <br />Activity 1.1 <br />Site Layout - Staking - Utility Coordination - CADD <br />$4,120.00 <br />205 <br />Site layout and utility coordination <br />16.00 Hour <br />115.00 <br />$1,840.00 <br />5099 <br />Trimble R8 Rover (horizontal and vertical), per hour <br />16.00 Each <br />80.00 <br />$1,280.00 <br />1862 <br />Utility Trip Charge <br />2.00 Each <br />60.00 <br />$120.00 <br />288 <br />Project Assistant <br />3.00 Hour <br />100.00 <br />$300.00 <br />371 <br />GIS/CAD Specialist II <br />2.00 Hour <br />140.00 <br />$280.00 <br />118 <br />Staff Engineer <br />2.00 Hour <br />150.00 <br />$300.00 <br />Activity 1.2 <br />Traffic Control (Subcontracted) <br />$3,800.00 <br />SUB <br />Traffic Control (Subcontracted) <br />2.00 Each <br />1,750.00 <br />$3,500.00 <br />118 <br />Staff Engineer <br />2.00 Hour <br />150.00 <br />$300.00 <br />Activity 1.3 _ <br />Ground Penetrating Radar <br />$3,475.00 <br />1600 <br />GPR Mobilization, per mile <br />60.00 Each <br />1.00 <br />$60.00 <br />1804 <br />GPR Equipment Fee, Roadway, per hour <br />9.00 Each <br />85.00 <br />$765.00 <br />383 <br />GPR Technician <br />9.00 Hour <br />130.00 <br />$1,170.00 <br />126 <br />Project Engineer <br />8.00 Hour <br />185.00 <br />$1,480.00 <br />Activity 1.4 <br />Pavement Coring and Hand Auger Borings <br />$7,930.00 <br />252 <br />Bituminous Coring, two person <br />22.00 Hour <br />255.00 <br />$5,610.00 <br />1861 <br />SPEC Trip Charge <br />2.00 Each <br />60.00 <br />$120.00 <br />1555 <br />Bituminous patch material, per core <br />40.00 Each <br />25.00 <br />$1,000.00 <br />118 <br />Staff Engineer <br />8.00 Hour <br />150.00 <br />$1,200.00 <br />Activity 1.5 <br />Drilling Services <br />$2,940.00 <br />9000 <br />Truck Mounted Drilling Services, per hour <br />7.00 Each <br />420.00 <br />$2,940.00 <br />1029 <br />Standby time, per hour <br />Each <br />420.00 <br />$.00 <br />Activity 1.6 <br />Sample Review and Laboratory Testing <br />$3,150.00 <br />1152 <br />Moisture content (ASTM D 2216), per sample <br />60.00 Each <br />20.00 <br />$1,200.00 <br />1156 <br />Atterberg Limits: ILL and PL (ASTM D 4318), per sample <br />1.00 Each <br />130.00 <br />$130.00 <br />1162 <br />Sieve analysis with 200 wash (ASTM C 136 and C 117), per sample <br />2.00 Each <br />160.00 <br />$320.00 <br />1166 <br />200 wash (ASTM C 117), per sample <br />8.00 Each <br />100.00 <br />$800.00 <br />1174 <br />Organic content (ASTM D 2974), per sample <br />1.00 Each <br />100.00 <br />$100.00 <br />118 <br />Staff Engineer <br />4.00 Hour <br />150.00 <br />$600.00 <br />Activity 1.7 <br />Engineering and Reporting <br />$3,880.00 <br />138 <br />Project Assistant <br />5.00 Hour <br />100.00 <br />$500.00 <br />125 <br />Project Control Specialist <br />2.00 Hour <br />150.00 <br />$300.00 <br />118 <br />Staff Engineer <br />Hour <br />150.00 <br />$.00 <br />09/04/2025 10:46 AM Page 1 of 2 <br />