My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-09-2025 JDA Agenda Packet
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Joint Development Authority (JDA)
>
JDA Agenda Packets
>
2025
>
09-09-2025 JDA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2025 1:24:26 PM
Creation date
9/25/2025 1:23:35 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Updated 9/5/2025 <br />EVSE, and be near the proposed location of the EV parking spaces. The circuit shall <br />have no other outlets. The service panel shall include an over-current protective <br />device and provide sufficient capacity and space to accommodate the circuit and over- <br />current protective device and be near the proposed location of the EV parking spaces. <br />For two adjacent EV-capable spaces, a single branch circuit is permitted. <br />2.5.5.3. EV-capable: A dedicated parking space which is provided with electrical panel <br />capacity and space to support a minimum 40-amp, 208/240-volt branch circuit for <br />each EV parking space, and the installation of raceways, both underground and surface <br />mounted, to support the EVSE. For two adjacent EV-capable spaces, a single branch <br />circuit is permitted. <br />1.1. Reporting. On an annual basis, all owners shall report monthly whole-building energy <br />consumption, on-site energy generation, electrical demand, and water use to Energy Star <br />Portfolio Manager and ensure this information is accessible to the JDA. Owners shall provide <br />other building data upon the reasonable request of JDA. <br />2. Implementation and Compliance. Developers will comply with these guidelines by following the below <br />approval and documentation processes concurrent with all other JDA review processes. <br />2.1. Approval Process. <br />2.1.1. Developer reviews Sustainability Design Guidelines and participates in kickoff meeting with <br />sustainability consultant (LHB). Developer also participates in Energy Design Assistance <br />(EDA) Program, a free energy consulting service, to understand energy efficiency options for <br />their development and develop a whole building energy model (single-family homes <br />exempted from EDA program). <br />2.1.2. Following the kickoff meeting and additional meetings as necessary, sustainability <br />consultant provides summary memo of SDG compliance measures. <br />2.1.3. Upon agreement of the Developer and staff regarding compliance with the guidelines, or <br />upon agreement with the JDA regarding the terms of a waiver, Staff incorporates SDG <br />compliance measures into Development Agreement between JDA and Developer. <br />2.2. Waivers. If the Developer determines they cannot adhere to all items in the SDG, Developer <br />must complete the Waiver Request Process. The measures in these guidelines may be modified <br />for individual developments for reasons of hardship. Alternative strategies that show <br />demonstrable and quantifiable progress towards the Green Energy Vision may be considered as <br />alternative compliance. Developers will go through the following process to request waivers to <br />the SDG. <br />2.2.1. Developer completes waiver request form, including justification for requested waivers. <br />2.2.2. Sustainability consultant reviews waiver request form and prepares memo for staff who will <br />make a recommendation to the JDA. This memo includes discussion of the impacts of <br />requested waivers on JDA sustainability goals, such as greenhouse gas emissions and LEED <br />for Communities certification, and the reasonableness of the waiver request.
The URL can be used to link to this page
Your browser does not support the video tag.