Laserfiche WebLink
<br /> ., . <br /> II. BUILDING CONSTRUCTION <br /> . Building Permits Fees are based upon Table IA <br /> of the 1997 U.B.C. and are <br /> determined by the City's <br /> Building Official. <br /> Plan Review Fee 65% of Building Permit Fee <br /> Re- Inspection $20.00 <br /> STATE SURCHARGE .0005 x construction value <br /> Manufactured $50.00 <br /> Home Location <br /> Permit <br /> Demolition, Includes: Wrecking, 50.00 <br /> Relocation and relocating and moving <br /> Moving buildings <br /> Swimming Pool 50.00 <br /> STATE SURCHARGE 0.50 <br /> Plumbing Minimum Fee $35.00 <br /> . Residential First Fixture 1.25 % of total bid <br /> Each Additional Fixture <br /> . Commercial, 1.25% of Total Bid <br /> . Industrial, plus $50.00 <br /> Institutional <br /> STATE SURCHARGE **0.50 <br /> **Surcharge computation is based on the permit fee. <br /> Surcharge equals 0.0005 of each nermit fee, or $.50, whichever is greater. <br /> Electrical Permit 1 Minimum Fee I *$22.00 <br /> Maximum Fee $110.00 for Single Familv Dwelling <br /> Other fees are based on amperage and are <br /> determined bv the City's Electrical Inspector. <br /> I STATE SURCHARGE I 0.50 <br /> Heating or Minimum Fee $35.00 <br /> Mechanical Permit <br /> . Residential 2% of total bid <br /> . Commercial, 1.25% of Total Bid <br /> Industri aI, plus $50.00 <br /> Institutional <br /> STATE SURCHARGE **0.50 <br /> . Surcharge computation is based on the permit fee. <br /> Surcharge eauals .0005 of each permit fee, or $.50, whichever is greater. <br /> \\Earth\Admin\Deputy Clerk\FEE SCHEDULE\2004\2004 Fee Schedule.doc Page 2 <br />