My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
327
ArdenHills
>
Administration
>
City Council
>
Ordinances
>
2000-2009
>
2001
>
327
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2019 3:01:55 PM
Creation date
11/10/2006 3:06:12 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. Excavation Permit Fee. The excavation permit fee shall be established by the <br />40 City in an amount sufficient to recover the following costs: <br />1. The City cost; <br />2. The degradation of the Right -of -Way that will result from the <br />excavation; <br />3. Restoration, if done or caused to be done by the City. <br />B. Obstruction Permit Fee. The obstruction permit fee shall be established by <br />the City and shall be in an amount sufficient to recover the City cost. <br />C. Disruption Fee. The City may establish and impose a disruption fee for <br />unreasonable delays in excavations or obstructions. <br />D. Payment of Permit Fees. No excavation permit or obstruction permit shall be <br />issued without payment of all fees required prior to the issuance of such a <br />permit unless the applicant shall agree (in a manner and substance acceptable <br />to the City) to pay such fees within thirty (30) days of billing therefor. All <br />permit fees shall be doubled during a probationary period. Permit fees that <br />were paid for a permit which was revoked for a breach are not refundable. <br />Any refunded permit fees shall be less all City cost up to and including the <br />date of refund. <br />• E. Use of Permit Fees. All obstruction and excavation permit fees shall be used <br />solely for City management, construction, maintenance and repair costs of the <br />Right -of -Way. <br />360.05 Right -of -Way Restoration <br />Subd. 1. The work to be done under the permit, and the restoration of the Right -of - <br />Way as required herein, must be completed within the dates specified in the permit, <br />increased by as many days as work could not be done because of circumstances <br />constituting force majeure or when work was prohibited as unseasonal or <br />unreasonable under this Chapter all in the sole determination of the City. In addition <br />to its own work, the permittee must restore the general area of the work, and the <br />surrounding areas, including the paving and its foundations, to new or better <br />condition than existed before the commencement of the work and must inspect the <br />area of the work and use reasonable care to maintain the same condition for thirty-six <br />(36) months thereafter. <br />A. In its application for an excavation permit, the permittee must restore the <br />Right -of -Way. If the City should choose to perform the Right -of -Way <br />restoration, the City shall require the permittee to pay a restoration fee to <br />provide for reimbursement of all costs associated with such restoration. The <br />City may, in lieu of performing the restoration itself, impose a fee to fully <br />compensate for the resultant degradation as well as for any and all additional <br />City costs associated therewith. Such fee for degradation shall compensate the <br />360-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.