Laserfiche WebLink
ARDEN HILLS CITY COUNCIL WORK SESSION — SEPTEMBER 22, 2025 6 <br />as a trail. Installing a trail to Lake Lane is great but then they have to pick up that little area. It <br />would be nice if that area could be a little safer. <br />John Mazzitello said he heard her say she would like some temporary measures to keep that <br />together until we can get to something more permanent. He will see what the maintenance crew <br />can do, or try to tie it into the first leg of the project. <br />Councilmember Monson repeated the areas he outlined. She asked for more information on <br />what the alternatives analysis is. <br />John Mazzitello said the section from Lake Lane North to County Road E is the last one that gets <br />built. He wants someone to look at the pros and cons of several different alternatives. The <br />alternatives analysis will spawn a design, a right-of-way acquisition and then a project in 2031. In <br />the middle is the County Road E up to the Old Snelling roundabout segment. That is the biggest <br />of the three legs, but the simplest. <br />Councilmember Monson asked if any power lines have been moved/buried or if trees have been <br />removed. <br />John Mazzitello said they follow the State Aid standards for clear zone safety for vehicles and <br />pedestrians. They have moved some power lines. Every time they have talked about burying lines, <br />Xcel Energy says the residents have to pay for it. <br />Councilmember Monson said there are big cottonwoods along there. The County said these <br />aren't imminent on the list of hazard trees. She would like buried lines to be explored. <br />Mayor Grant said if the cost participation policy goes into effect in 2027 and we want a trail <br />from County Road E2 to Perry Park, would that be a part of the participation policy. <br />John Mazzitello said a City -led project like that, to install a trail or sidewalk along a County <br />road, would be more County than City. <br />Mayor Grant would be happy to call the County Commissioner and express approval. <br />Councilmember Monson asked if New Brighton Road is included in the TIP and asked if is it a <br />mill and overlay. <br />John Mazzitello confirmed it is in 2026 and it is mill and overlay with County Road E and <br />County Road D. <br />Councilmember Monson said we would probably have to do a City -led trail there. <br />John Mazzitello confirmed. He said the 2026 projects have all been designed already. <br />Councilmember Monson said she assumes there is no plan for a trail beyond that, from the <br />County, otherwise they would have designed it in 2026. <br />Public Works Director/City Engineer Swearingen requested a connection from County Road <br />E2 to Perry Park. It was beyond the scope of that pavement preservation program. <br />