Laserfiche WebLink
<br /> ... . . <br /> . (4) Location of site improvements, including drives, parking lots or structures, landscape <br /> areas and any other site features that will aid the City in evaluating the application. <br /> (5) Location and height of proposed antenna, dish antenna or tower. <br /> (6) Elevation drawing of proposed antenna, dish antenna or tower. <br /> b. Site Elevation Drawings and/or Site Section Drawings. Drawings shall be provided that <br /> show how the screening will effectively be accomplished as defined in (6) above. Site lines <br /> should be illustrated both in plan and section showing vertical and horizontal relationships to <br /> neighboring properties. <br /> c. All applications for the City's water towers must include a signed report from a state <br /> registered engineer showing compliance with all applicable codes, standards and structural <br /> requirements of how the additional antennas will affect the water tower structure. A final <br /> inspection report from a state registered engineer showing work completed in compliance with <br /> previously approved plans shall also be required. <br /> d. A building permit shall be required for all applications except tbose as stated in Section VI <br /> (I) #1. <br /> . Effective Date. This ordinance shall become effective the day following its publication. <br /> Adoption Date. Passed by the City Council of the City of Arden Hills the 10th day of <br /> October, 2000. <br /> D <br /> Publication Date. Published on the ~ of ND'JeW\~YL. ,2000. <br /> . <br />