My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-10-25-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
11-10-25-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2025 11:33:01 AM
Creation date
11/7/2025 11:27:35 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2026 thru 2030 <br />Capital Improvement Plan <br />Arden Hllls, MN <br />Project # 26-W-003 <br />Project Name Trunk Water Main Condition Assessment <br />Total Project $40,000 Department Water Department <br />Cost <br />Type Unassigned Category Utility Maintenance <br />Priority 2 Very Important Status Active <br />Useful Life 10 years TCAAP No <br />Description <br />Evaluated the condition of 16" water main between North and South towers to determine the degree of corrosion and deterioration in 2020-2021. The evaluation will develop <br />a long-term plan for rehabilitation of this critical water main segment. Inspection via ultrasonic testing is needed to evaluate existing conditions in critical locations along the <br />Trunk Watermain. <br />2026 - Evaluation at Hamline Ave. N. near Ingerson and Dunlap St. N. near Ingerson <br />2028 - Inspections and testing at Dunlap St. N. near Grey Fox Road <br />Justification <br />The trunk water main extending between the north and south elevated storage tanks is one of the most important and critical segments of the water distribution system for <br />supplying water to the northern portion of the City. Segments of the water main have been in service for more than 52 years. <br />Expenditures 2026 2027 2028 2029 2030 Total <br />Construction/Maintenance 20,000 <br />0 <br />20,000 <br />0 <br />0 <br />40,000 <br />Total 20,000 <br />Funding Sources 2026 <br />0 <br />2027 <br />20,000 <br />2028 <br />0 <br />2029 <br />0 <br />2030 <br />40,000 <br />Total <br />Water Utility Funds 20,000 <br />0 <br />20,000 <br />0 <br />0 <br />40,000 <br />Total 20,000 <br />0 <br />20,000 <br />0 <br />0 <br />40,000 <br />75 <br />Produced Using Plan -It CIP Software Page 70 / 75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.