Laserfiche WebLink
2026 thru 2030 <br />Capital Improvement Plan <br />Arden Hllls, MN <br />Project # 26-W-007 <br />Project Name Water System Model Update <br />Total Project $42,750 <br />Cost <br />Type Operational Maintenance <br />Priority 3Important <br />TCAAP No <br />Department Water Department <br />Category Utility Improvements <br />Status Active <br />Description <br />Conduct a Water System Model update. <br />Justification <br />The last water model was conducted in 2019. Since then upgrades have been made at critical locations of the water distribution system. An update is needed to show current <br />conditions. <br />Expenditures 2026 2027 2028 2029 2030 Total <br />Planning/Design 42,750 0 0 0 0 42,750 <br />Total 42,750 0 0 0 0 42,750 <br />Funding Sources <br />2026 <br />2027 <br />2028 <br />2029 <br />2030 <br />Total <br />Water Utility Funds <br />42,750 <br />0 <br />0 <br />0 <br />0 <br />42,750 <br />Total 42,750 <br />0 <br />0 <br />0 <br />0 <br />42,750 <br />79 <br />Produced Using Plan -It CIP Software Page 74 / 75 <br />