My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-10-25-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
11-10-25-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2025 11:33:01 AM
Creation date
11/7/2025 11:27:35 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water Permits - Holiday or <br />Weekend <br />Inspection or Re -inspection <br />Call -out rate per visit, <br />minimum <br />of 2 hours <br />$150.00 per hour <br />e2 000 deposit, ,, ly -epA l e� <br />at <br />$33 nn t fee <br />water- po,.m of <br />$1 an nn State s,,,.,,h " 1 nn <br />-g <br />Pitts . plieAh-lo <br />Water- Mete/ 6e-r- Char-ges— <br />Customer- Requested Wa4er- Mete <br />Fee inel„des -e .,l f <br />meter-, Igor ti test t <br />to <br />mote. Size C <br />Basel <br />n f aet <br />P41ie Wef4Es for- Quote <br />r-ettiming meter- r-esidenee�, <br />Roo <br />be if the- <br />will not applied <br />meter- f ,,a t be <br />inaeettr-ate to degree- <br />,mot (34 <br />4ffee <br />exeeeding p <br />f the be L, <br />f-,,,Y, the <br />result <br />test <br />Water Meter/Spacer Charges <br />Water-Meter,4Spase-r- Charges <br />Standard Meter <br />$48&98City cost plus 10% admin <br />fee <br />5/8" x 1/4" Meter Model 25 <br />r P41ie Wafks f r- <br />3/4" x 7 1/2' Meter Model 35 <br />naet <br />QHot-- i cost plus 10% admin fee <br />1" <br />$590.000 , cost plus 10% admin. <br />fee <br />Meter or rg eater <br />r r4aet Publie 3a',.,-vs for- <br />G-ea4e-tl,a 12 <br />Quote <br />Customer Requested Water Meter <br />Fee includes removal of meter, <br />5/8" to 1" water meter: $250.00 <br />Accuracy Test <br />installation and administration of <br />Greater than 1" meter: $500 <br />temporary meter, testing services, <br />and returning meter to residence; <br />$855.00 per acre or portion <br />thereof <br />Fee will be reimbursed if the meter <br />is found to be inaccurate outside of <br />WWA allowed tolerances <br />Water Connection Fee - <br />Connection fee for previously un- <br />served or expanded lots <br />Water Availability Fee - <br />New or Additional Units <br />The units are based on the <br />Metropolitan Council's <br />formula for calculating new <br />sewer availability charge <br />SAC units <br />$ 1,375.00 per unit <br />TCAAP Water Availability <br />Fee <br />This fee applies to the <br />TCAAP development only. <br />$5,360.00 <br />The units are based on the <br />Metropolitan Council's <br />formula for calculating new <br />sewer availability charge <br />SAC units <br />Sewer Connection Fee - <br />Connection fee for previously un- <br />served or expanded lots <br />$840.00 per acre or portion <br />thereof <br />Sewer Availability Fee - <br />New or Additional Units <br />The units are based on the <br />Metropolitan Council's <br />formula -for calculating new <br />sewer availability charge <br />$ 825.00 per unit <br />Page 9 of X <br />
The URL can be used to link to this page
Your browser does not support the video tag.