2026 thru 2030 <br />Capital Improvement Plan <br />Arden Hllls, MN <br />Project # 28-Str-001 <br />Project Name 2028 PMP <br />Total Project $6,345,000 Department Street Department <br />Cost <br />Type Improvement Category Streets: Reconstruction <br />Priority 2 Very Important Status Active <br />Useful Life 20 years TCAAP No <br />Description <br />Pavement Management Program (PMP) improvements consisting of spot curb repair, resurfacing as mill & overlay or full depth reclamation with new bituminous pavement, <br />repairs to storm sewer inlets, dredging Fernwood, Hunters and Benton ponds and adding grit chambers, repairs to sanitary sewer manholes and castings, CIPP lining of <br />existing clay pipe, watermain replacement within Benton Way neighborhood that affects the streets, hydrant and valve repairs. <br />Street segments include: Benton Way, Tiller Lane (Lexington to Cannon Ave), Cannon Ave (Tiller Ln to Dunlap), Dunlap (Cannon Ave to Tiller Lane), Pine Tree Dr, Harriet <br />Ave, Walden PI, Lametti Ln, Lametti Ct, Bussard Ct, Hunters Ct, Fernwood St, Dellwood Ave and Carlton Dr. <br />Justification <br />Pavement conditions are showing distress with condition ratings from 15 to 59. Pavement conditions will continue to decline. Proposed improvements are necessary to <br />continue safe and reliable street and utility services. These improvements will address the increasing costs for patching and maintaining highly deteriorated street pavement <br />within the City, extensive large area patching was performed in 2022 by Public Works. Watermain within Benton Way neighborhood consists of 58-year old cast iron pipe and <br />has experienced several breaks in recent years, the goal will be to replace the segments that could impact the new road surface. Pond dredging is overdue in several ponds <br />within the project corridor, City staff has received feedback from residents to perform maintenance. CIPP lining of the existing clay sanitary sewer pipe will prevent inflow and <br />infiltration and root intrusion as well as extending the life of the pipe for 50+ years. <br />Expenditures <br />2026 <br />2027 <br />2028 <br />2029 <br />2030 <br />Total <br />Construction/Maintenance <br />0 <br />0 <br />6,345,000 <br />0 <br />0 <br />6,345,000 <br />Total 0 <br />0 <br />6,345,000 <br />0 <br />0 <br />6,345,000 <br />Funding Sources <br />2026 <br />2027 <br />2028 <br />2029 <br />2030 <br />Total <br />Other <br />0 <br />0 <br />2,075,000 <br />0 <br />0 <br />2,075,000 <br />Surface Water Mgmt Utility Funds <br />0 <br />0 <br />1,410,000 <br />0 <br />0 <br />19410,000 <br />Capital Improvement Funds (PIR) 0 0 1,280,000 0 0 1,280,000 <br />Sanitary Sewer Utility Fund 0 0 620,000 0 0 620,000 <br />State Aid 0 0 480,000 0 0 480,000 <br />Water Utility Funds <br />0 0 480,000 0 0 480,000 <br />Total 0 0 6,345,000 0 0 6,345,000 <br />7 <br />Produced Using Plan -It CIP Software Page 2 / 75 <br />