Laserfiche WebLink
2026 thru 2030 <br />Capital Improvement Plan <br />Arden Hllls, MN <br />Project # 26-Sew-002 <br />Project Name Lift Station Rehabilitation <br />Total Project $1,607,000 Department Sanitary Sewer Department <br />Cost <br />Type Maintenance Category Sanitary Sewer Maintenance <br />Priority 2 Very Important Status Active <br />Useful Life 20 years TCAAP No <br />Description <br />Rehabilitation of lift stations to standardize and replace aging equipment, including pumps and electrical components. <br />2026: <br />• LS 1 is scheduled for two pump rebuilds. Parts and Labor cost- $20,000 <br />• LS 4 is scheduled for two pump rebuilds. Parts and Labor cost- $20,000 <br />• LS 5 is scheduled for a full wet well rehab. This includes 2 pump replacements, base elbows, wet well misc. plumbing, and wet well epoxy coating and bypass <br />pumping. Budget Estimate is $150,000 <br />2027: <br />• LS11 is scheduled for 2 pump rebuilds. The budget cost is $20,000 <br />• LS 12 is scheduled for 2 pump rebuilds. The budget cost is $20,000 <br />• LS 9 is scheduled for 2 pump rebuilds. The budget cost is $20,000 <br />2029: <br />• LS 8 is scheduled for a full wet well rehab. This includes 3 pump replacements, base elbows, wet well misc. plumbing, check valves, and wet well epoxy coating and <br />bypass pumping. Budget Estimate is $200,000 <br />• LS 9 is scheduled for 2 pump rebuilds. The budget cost is $23,000 <br />2030: <br />• LS 3 is scheduled for 2 pump rebuilds. The budget cost is $24,000 <br />2032: <br />• LS 12 is scheduled for a full wet well rehab. This includes 2 pump replacements, base elbows, wet well misc. plumbing, check valves, and wet well epoxy coating and <br />bypass pumping. Budget Estimate is $200,000 <br />Justification <br />The City has maintained a program to refurbish and update sanitary sewer lift stations on a frequencies that meet the demand and use, technology and risk management. Lift <br />station pumps are routinely inspected, tested and replaced as necessary to prevent failure. <br />Prior Expenditures 2026 2027 2028 2029 2030 Total Future <br />910,000 Construction/Maintenance 190,000 60,000 0 223,000 24,000 497,000 200,000 <br />Total 190,000 60,000 0 223,000 24,000 497,000 <br />Prior Funding Sources 2026 2027 2028 2029 2030 Total Future <br />910,000 Sanitary Sewer Utility Fund 190,000 60,000 0 223,000 24,000 497,000 200,000 <br />Total 190,000 60,000 0 223,000 24,000 497,000 <br />Budget Impact <br />Reduced maintenance costs. <br />29 <br />Produced Using Plan -It CIP Software Page 24 / 75 <br />