<br /> -- ---------
<br /> ... '"I
<br /> FINAL PA YMEI',tr E1:l'TIl"IATE I
<br /> -.
<br /> NO. 4 (FINAL)
<br /> FROM: DECEMBER I. 1995
<br /> TO: AUGUST 25, 1996
<br /> I
<br /> CONTRACTOR: VALLEY PAVING. INC.
<br /> ADDRESS: 4105 - 85TH AVENUE N., BLDG. B, SUITE 202, BROOKLYN PARK, MN 55443 I
<br /> O\VN'ER: CITY OF ARDEN HlLLS. M[NNESOTA
<br /> PROJECT: [995 STREET IMPROVEMENTS (520-055-30)
<br /> CUMPLETION DATE AMOUNT OF CONTRACT: I
<br /> ORIGINAL: OCTOBER 15, J 995 ORIGINAL: .'5360,008.80
<br /> REVISED: REVISED: 5375,897.80
<br /> I
<br /> I
<br /> SCHEDULE 1.0 STOWE AVENUE
<br /> 1 2104.501 REMOVE RCP PIPE LF 20.00 17.00 O.DO O.DO 26.00 44UK) I
<br /> 2 2[04.501 REMOVE CMP PIPE LF 35.00 12.00 O.DO 0.00 38.00 456.00
<br /> 3 2[04.509 REMOVE MANHOLE EA I.DO 575.00 0.00 O.DO 1.00 575.00
<br /> 4 2105.501 COMMON EXCA V A TION (P) CY 2,050.00 6,00 0.00 0.00 2,050.00 12,300.00
<br /> 5 2105.507 SUBGRADE EXCA V A TION CY 600.00 4.50 ODO 0.00 50.00 225.00 .-
<br /> 6 2105.522 SELECT GRANULAR BORROW - CV CY 600.00 9.60 0.00 0,00 0.00 0.00
<br /> 7 2105.500 SUBGRADE PREPARATION RDSTA 13.20 ]65.00 O.DO 0.00 12.60 2,079.00
<br /> 8 2[05.525 TOPSOIL BORROW - CV CY 450.00 13.00 0.00 0.00 150.00 1.950.00 I
<br /> 9 221l.501 AGGREGATE BASE -- CLASS 5A TN 2.300.00 7.00 ODO 0.00 1,748.47 ]2,239.29
<br /> 10 0231.602 BITUMINOUS PATCH[NG SY 150.00 10.00 0,00 0,00 0.00 000
<br /> 11 2232.501 MILL BITUMINOUS SURFACE SY 85.00 3.50 0.00 0.00 605.00 2,tI7.50
<br /> 12 234L508 TYPE 41A BITUMINOUS WEAR COURSE TN 520_00 21.50 0.00 0.00 511.16 11.032.94 I
<br /> 13 2340.5J4 TYPE 318 BITUMINOUS BASE COURSE TN 780.00 19.85 a.O(] 0.00 572.33 11,360.75
<br /> 14 033L601 2' BITUMINOUS DRIVEWAY PAVEMENT SY 230.00 7.50 39.00 292.50 423.00 3,172.50
<br /> 15 2357.502 B[TUMINOUS FOR TACK COAT GAL 225.00 U5 0.00 0.00 295.00 398.25
<br /> 16 2535.501 BlTUMINOUS CURB LF 325.00 2.93 0.00 0.00 320.00 937.60 I
<br /> 17 2521.501 4' CONCRETE WALK SF 40.00 2.30 0.00 0.00 6.00 13.80
<br /> " 253L50l B618 CONCRETE CURB & GUTTER LF 2,880.00 5.70 0.00 0.00 2,473.00 14,096.10
<br /> 19 253[.507 6" CONCRETE DRIVEWAY PAVEMENT SY 21:15.0(] 23.00 !4.oo 322.00 1]4.00 2,622.00 I
<br /> 20 253!.507 6' CONCRETE DRIVEWAY APRON SY 180.00 24.00 0,00 0.00 238.00 5,712.00
<br /> 21 0563.602 INLET PROTECTION EA [2.00 45.00 0.00 0,00 0.00 0.00
<br /> 22 2575.505 SODD]NG. TYPE LAWN & BOULEVARD SY 4.170.00 1.45 0.00 0,00 2,300.00 3,335.00
<br /> 23 2502.501 4" PERFORATED HDPE PIPE DRAIN WIT LF 800.00 7.50 0.00 0,00 0.00 0.00 I
<br /> TYPE I GEOTEXTILE SOCK
<br /> 24 2506.509 DRA[N TILE CORE CONNECTIONS EA 8.00 150.00 0.00 0.00 0.00 0.00
<br /> 25 2501.567 30" RCP SAFETY APRON & GRATE EA 1.00 2,100.00 0.00 0.00 LOO 2,100.00
<br /> 26 2503.541 30' RCP P[PE CL III, DESIGN 3006 LF 33.00 87.60 O.DO 0.00 33.00 2,890.80 I
<br /> 27 2503.541 21' RCP PIPE CL III, DESIGN 3006 LF 614.00 39.20 0.00 0.00 615.00 24,108.00
<br /> 28 2503.541 18' RCP PfPE CL III, DESIGN 3006 LF 991.00 24.75 0.00 0.00 986_00 24,403.50
<br /> 29 2503.541 15' RCP PtPE CL III, DESIGN 3006 LF 260.00 22.70 0.00 0.00 2[5.00 4,880.50
<br /> 30 2503.541 12" RCP PrPE CL Ill, DESIGN 3006 LF 9O.DO 21.00 0.00 0.00 96.00 2,016.00 I
<br /> 31 2506.508 CONSTRUCT MANHOLE, STORrvl 48' DI EA 5.00 980.00 D.OO 0.00 9.00 8,820.00
<br /> 32 2506.508 CONSTRUCT BAFFLE MH, STORM 96" 0 EA I.DO 6,350_00 0.00 0.00 ].00 6,350.00 ..
<br /> 33 2506.509 CONSTRUCT CATCH BASIN, 24" x: 36" EA 6.00 830.00 0.00 0.00 4.00 3,320.00
<br /> 34 2506.522 ADJUST FRAME AND RING CASTING EA 6.00 175.00 0.00 0.00 5.00 875.00
<br /> 35 2531.511 PEDESTRIAN RAMP EA I.DO 200.00 0.00 0.00 0.00 0.00
<br /> 36 0504_602 ADJUST HYDRANT AND VALVE BOX EA 2.00 445.00 O.W 0.00 0.00 0.00
<br /> 52oo57H4.XLS Page I 520"057.3{) I
<br />
|