My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-15-1996
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1996
>
CCP 10-15-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:12:39 PM
Creation date
11/10/2006 3:11:01 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />________..____n__ <br /> DF) A FT I <br /> . "k'{A <br />ARDEN HILLS CITY cm JNCIL - SEPTEMBER 30. 1996 6 .1 <br />there is a lot ofland on the south side which is not being used. Mayor Probst eXplained the <br />access to the Lake will be driven in terms of clean-up which is not under the control of Arden I <br />Hills. He reviewed the past activity in trying to gain access to other segments of land and noted <br />that dollars being allocated by Congress for clean-up activities are declining greatly. Mayor I <br />Probst advised there are some indications the Arsenal will be looking for opportunities to <br />remediate some areas at a lower cost and may declare the Round Lake area to be alright as long <br />as it is left undisturbed. I <br />Mayor Probst advised the Council is interested in bringing development to the area south of <br />Round Lake but issues with regard to access need to be addressed. He stated the frontage road is I <br />of interest to open that segment to development and resolve safety issues at the location of the <br />off-ramp. <br />Mayor Probst explained another concern of the City is funding a percentage of the overall cost I <br />for the reconstruction of Highway 96 and there is some urgency in the timeline to make basic I <br />decisions so the State can encumber funds towards this project which will lessen the City's <br />contribution. <br />Mr. Tolaas stated the County anticipates a 50% increase in traffic volume over the next 20 years, I <br />which has been factored into the design and this increase will occur with or without the proposed <br />roadway improvement. He advised the proposed project will create a noise level which exceeds .. <br />the State standard of 65 decibels so tllis area has been identified for noise walls which would <br />reduce the noise violation to within the standard. He explained this is another issue which would <br />be brought before the Council and community; to determine if noise walls are aeceptable. On I <br />safety, no signalization is being proposed at the entrance of the mobile home park. Signals <br />would be timed to provide a somewhat better opportunity to leave the park and a left turn lane <br />would be provided. Right turns would be provided for in a right turn lane so all turning I <br />movements would be protected. With regard to bicyclers, there is a lot of traffic in this area so <br />Ramsey County supports a separated bicycle pathway area. I <br />Mayor Probst inquired regarding action to be taken this evening. Mr. Tolaas explained Ramsey <br />County is not asking the Council to select a preferred alternative but to determine whether this is I <br />suitable to pursue. Ifit is the preferred alternative, then Ramsey County can pursue it in earnest <br />and drop the original concept. If it is important to keep the original concept open, then Ramsey <br />County will continue to pursue both concepts. If the community believes the second option is I <br />totally unacceptable, then it will be dropped and the original concept pursued. <br />Council member Hicks asked what Ramsey County will do if it is not a viable alternative to I <br />displace homes and then a large contamination is found. Mr. Tolaas advised that Ramsey <br />County knows the contamination of the Round Lake basin exists and before the project can <br />proceed, it needs to have a removal and disposal plan in place. I <br />Councilmember Hicks asked what would happen ifmore contamination is found during .. <br />construction. Mr. Tolaas advised the Army has done extensive testing and does not believe soils <br />are contaminated, in any way, north of Highway 96 along the construction corridor. <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.