My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-15-1996
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1996
>
CCP 10-15-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:12:39 PM
Creation date
11/10/2006 3:11:01 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> MnJDOT 30734 (Rev. 2-93) ~I <br /> REPORT OF FINAL ESTIMATE I <br /> Cotlllt)!Cityof: Arden Hills SAP.: 187-107-01 -. <br /> Name of Contractor: Vallev Pavinl1 Inc. Contract Amount: $375.897.80 <br /> TO THE COMMISSIONER OF TRANSPORTATION: I <br /> This is to certify that the above contract was let on July 28. 1995 and completed on <br /> Au~st 25. 1996 and final payment was made to the contractor on S~temher 30 1996 I <br /> The CoulJ.ty/City of Arden Hills hereby requests State-Aid Funds for construction I <br /> and engineering costs as detailed below. (Attached Final Estimate and include a quantity, unit <br /> price, and extension split for each State Aid Project.) <br /> FUND TYPE Municipal I <br /> FINAL CONTRACT! AGREEMENT COSTS: $34031625 $ $ I <br /> LESS NON-PARTICIPATING PORTION (LOCAL FUNDS) $18930157 $ $ <br /> NET CONTRACT/AGREEMENT COSTS (STATE AID) $151 014.68 $ $ I <br /> ENGINEERING $ 37 753 67 $ $ <br /> RIGHT-OF-WAY (CERTIFIED STATEMENT ATTACHED) $ $ $ .. <br /> OTHER $ $ $ <br /> TOTAL AMOUNT ELIGIBLE FOR STATE AID $188768.35 $ $ I <br /> LESS: <br /> STATE-AID FUNDS PREVIOUSLY PAID $ 63 226.25 $ $ I <br /> AMOUNT CHARGED TO STATE-AID BONDS $ $ $ I <br /> BALANCE DUE FROM STATE-AID FUNDS $125542 10 $ $ <br /> REMARKS: THE WORK IS COVERED BY SCHEDULE 1 O' SCHEDlJT.E 24 O' AND SCHEDULE 25 O. LR~S I <br /> ITEM NO.5. I <br /> I hereby certify that the wage rates paid on this contract were equal or exceeded the minimum I <br /> hourly rates required for work on state funded construction projects as determined by the <br /> Minnesota Department of Labor and Industry . <br /> Date: 10 00r~ ~ qq V Signed: ~C)S~ I <br /> Ity Engineer <br /> Date: Signed: .. <br /> District State Aid Engineer <br /> n:\clericaI\520\520-057.rfe 520-057-30 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.