My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-20-1996
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1996
>
CCP 02-20-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:12:43 PM
Creation date
11/10/2006 3:11:25 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />,.~ ... <br /> , <br />, CITY OF ARDEN HILLS <br />,. MEMORANDUM <br /> DATE: February 16, 1996 <br />, TO: Brian Fritsinger, City Administrator <br />, FROM: Dwayne Stafford, Public Works Superintendent <br /> SUBJECT: Old Highway 10 Improvements <br />I Back!!round <br />. In late December oflast year the Public Works staff identified a segment of water main, which <br /> has reached the point of needing replacement. After discussing the problem among staff and Mr. <br /> Stonehouse, it was decided to try and get through the winter before any work be done due to <br />I extra costs and quality of work associated with an emergency type winter job. Attached is the <br /> information provided earlier. Staff has asked that Tim Mayasich and Dan Solar from the Ramsey <br /> County Highway Department attend the February 20,1996 worksession to discuss the County's <br />I plan and scheduling for Old Highway 10 this coming summer. Staff would also like to explain <br /> our situation to them and agree on a schedule that the City and County are comfortable with. <br />.. County Improvements <br /> This coming summer Ramsey County plans improvements to Old Highway 10 from County <br /> Road F north to Highway 96. The plan is to remove any bituminous overlay from the existing <br />I concrete roadway then rubbleize the concrete pavement. (crush into small chunks). After this is <br /> done, the road would be re-surfaced with three layers of bituminous. The roadway would be <br /> widened at this time to a 32 foot width and new shoulders would be constructed. The City of <br />. Arden Hills could have the shoulders paved as part of the project, however, this would be done at <br /> Arden Hills expense. As of now, it has not been decided on the width of shoulders, but staff has <br />. estimated the cost of a 6 foot asphalt shoulder on both sides for 7800 feet to be slightly over <br /> $100,000.00. <br />. Watermain <br /> The 6 inch watermain should be replaced as discussed in the attached memos. The expected cost <br /> of this replacement is approximately $25,000. This money would have to come out of the Water <br />. Utility Fund or a special assessment could be made to those served by this line. <br /> Sewer Line <br />, Running parallel to the deteriorated water line needing replacement is an active sewer line. Staff <br /> recommends televising this line to determine its condition prior to replacing the waterline above <br /> it. <br />I <br />.e <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.