My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-26-1996
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1996
>
CCP 02-26-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:12:44 PM
Creation date
11/10/2006 3:11:28 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />., interoffice <br />. M E M ORA N DUM <br />. to: Mr. Brian Fritsinger <br /> from: Greg Stonehous~ <br />. subject: 1996 Street Improvement On-Site Meetings <br /> date: February 26, 1996 <br />. This memorandum was prepared to outline the information gathered at the referenced meetings <br /> for the 1996 Street Improvements Project. Last Wednesday and Thursday, Dwayne Stafford and <br />. I met with affected residents of Pascal Avenue, Oak Avenue, Ridgewood Court, McCracken <br /> Lane, and Eide Circle to gather further input regarding the project. The following information <br /> were of greatest concern to residents present at those meetings: <br />. Pascal Avenue <br />I II"~ Street width is of great concern. 26 feet is recommended with an absolute minimum of 24 feet. <br /> ~.\.! Drainage from the northern driveways needs to be accommodated. <br />~'J.'~~'x. \. (o~ Drainage from the turnaround area needs to be addressed. <br />t: " \r. ~1> Residents would like to relocate mailboxes along the street. <br /> '}~} Based upon soil borings, complete reconstruction is the recommended means ofrehabilitation. <br />,J \> ~ ~ trhree trees will be close to the project construction area; however, should not be impacted. <br />,A: t.~'t <br />~~lf' Oak Avenue <br />f ~ Street width is of great concern. 26 feet is recommended with an absolute minimum of 24 feet. <br /> t" Complete reconstruction is recommended based upon soil borings. <br />I~((II"" Several isolated drainage issues must be addressed. ~ I;tP <br /> Citizens are concerned with the loss of their "country" atmosphere with concrete curb installation 0 <br /> Surmountable curb versus barrier curb remains an issue. . 5 ~rl1InJ {'J' -Ju o.cCdfI' <br />. Street width is a concern with the island cul-de-sac (one way access) \vJ1I.(li~...s rtJ.."l. <br /> , ";01"'- <br /> Ridgewood Court <br />l c>- r <br /> ,..,~..\I! Drainage is the greatest concern at isolated locations (will require some storm sewer installation), <br />f~'~ Based upon need for drainage corrections, additional correction beyond overlay is necessary, <br /> Concerns over. assessment of street was also an issue. <br />.t McCracken Lane <br /> No residents present. <br />I , Cold-in-place recycling with edge drain installation should provide adequate solution. <br />I <br /> - - --- <br />
The URL can be used to link to this page
Your browser does not support the video tag.