My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 04-29-1996
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1996
>
CCP 04-29-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:12:48 PM
Creation date
11/10/2006 3:11:51 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1-'- , <br />I Honorable Mayor and City Council <br />,. April 3, 1996 <br /> Page Two <br /> Proposed Improvements <br />I The project improvements include the installation of an 8-inch watermain loop along Old <br /> 10 as shown on the attached Exhibit 1. The improvements would also include the <br />I installation of five hydrant assemblies and 20 residential water services to the lot lines of <br /> the residences along the roadway. <br />I Also in conjunction with the improvements is the replacement of a segment of 6-inch <br /> watermain between County Road F and Valentine Avenue. This segment of watermain <br />I replacement could be incorporated with this project if the City desires. However, as it is <br /> anticipated that the replacement of the existing watennain is not an assessable <br /> improvement, it has been proposed as a stand-alone project to this point. <br />I Project Costs <br />I The anticipated costs of the proposed Old Highway 10 watennain improvements are listed <br /> below: <br />Ie Construction Item Qtt,. .!lnit Unit Cost Th!.a! <br /> 12" x 8" Cut-in tee connections 2 EA $3,500 $ 7,OCfJ <br /> 8-inch DIP watermain 2,700 LF $ 16 $43,200 <br />I Hydrants with valve assembly 5 EA $1,500 $ 7,500 <br /> Residential water service 20 EA 5 450 $ 9,OCfJ <br /> Restoration 1 LS 52,500 $ 2.500 <br />1 Construction Total 569,200 <br /> Overhead Costs (32 %) $22.100 <br />I Estimated Project Cost $91,300 <br />I Project Funding <br />I The project is proposed to be financed using a combination of two sources, including the <br /> City of Arden Hills' water utility fund and property assessments to benefitting properties. <br /> According to the City's current assessment policy, the cost for constructing a watermain <br />I beyond the 6-inch residential minimum is to be a City cost. This amount is estimated to <br /> be approximately $8,200 to $9,700, based upon assumed construction and overhead costs. <br /> The remaining $81,000 to $83,000 would be funded through property assessments to those <br />I properties abutting Old Highway 10. <br />f' <br />I j~O/075-0~06.apr <br />
The URL can be used to link to this page
Your browser does not support the video tag.