Laserfiche WebLink
<br /> "'~I <br /> PARTIAL PAVME~'T ESTIl\-IATE .1 <br /> !"lO.l <br /> FROM: APRILl,1996 I <br /> TO: MAY3,1996 <br /> CONTRACTOR: JAY BROTHERS, INC. I <br /> ADDRESS: 9218 LAKE DRIVE N.E., FOREST LAKE, MN 55025 <br /> OWNER: CITY OF ARDEN HILLS, MINNESOTA I <br /> PROJECT: 1995 STORM WATER IMPROVEMENTS (520-064-30) <br /> COMPLETION DATE AMOU~''T OF CONTRACT: <br /> ORIGINAL: JULY 15,1996 ORIGINAL: $ 54,466.00 I <br /> REVISED: REVISED: <br /> I <br /> SCHEDlII F. 1 0 LAKE JO~RPHTNE mm RT I <br /> I MUCK EXCA V A TION CY 20 10.00 20.00 200.00 20.00 200,00 <br /> 2 PAVEMENT REMOVAL SY 60 2,00 66.00 t32.00 66.00 132.00 <br /> , REMOVE eMP LF 96 26.00 96.00 2,496.00 96.00 2,496.00 I <br /> 4 REMOVE eMP PES EA 4 50.00 4,00 200.00 4,00 200.00 <br /> , 36- ARCH PIPE (CL IIA) LF 6<) 188.00 6<),00 11,280.00 6<),00 11,280.00 <br /> 6 36" ARCH Rep PES, WfSAFETY GUARD EA 4 ],200.00 4,00 4;800.00 4,00 4,800.00 .. <br /> 7 FOUNDATION MATERIAL CY 20 20.00 20.00 400,00 20.00 400,00 <br /> 8 COMMON BORROW CY 7 ]5.00 0,00 0,00 0,00 0,00 <br /> 9 DITCH GRADING CY 4 15.00 0,00 0,00 0,00 0,00 I <br /> 10 RIP RAP, CLASS III, GROUTED CY 22 6<),00 0,00 0,00 0,00 0,00 <br /> " SEEDING AC 0.5 2,000.00 0,00 0,00 0,00 0,00 <br /> .2 WOOD FIBER BLANKET - HIGH VELOCITY SY 250 5,00 0,00 0,00 0,00 0,00 I <br /> IJ S(L T FENCE. HEAVY DUTY LF 120 3,00 0,00 0,00 0,00 0,00 <br /> 14 BlTUMINOUS PATCH SY 60 16.00 0,00 0,00 0,00 0,00 <br /> 15 4" EQUIV. WIDTH SfRIPING, YELLOW LF 80 1.00 0,00 0,00 0,00 0,00 I <br /> 16 4" EQUIV. WIDTH STRIPING, WHITE LF 80 1.00 0,00 0,00 0,00 0,00 <br /> T SCHEDULE 1.0 LAKE JOSEPHINE OlITLET-TOTAL 19,508.00 19,508.00 I <br /> SCHRDlITR20 KARTHIAKERAV"Il'\"F. <br /> 1 MUCK EXCAVATION CY '0 18.50 0,00 0,00 0,00 0,00 I <br /> 2 DlrCH GRADING (P) CY 30 15.00 0,00 0,00 0,00 0,00 <br /> , REMOVE Ir HDPE LF 11 ',00 It.OO 55.00 11.00 55.00 <br /> 4 BALE CHECKS EA 8 (45.00 8,00 1,160.00 8,00 1,160.00 <br /> , SILT FENCE LF 400 3,00 100.00 300.00 100.00 300.00 I <br /> 6 CHECK DAM EA , 760.00 0,00 0,00 0,00 0,00 <br /> 7 12" HDPE LF 26 74.00 26.00 1,924.00 26.00 1,924.00 <br /> 8 lr HDPE APRON EA I 100.00 1.00 100.00 1.00 100.00 I <br /> 9 W HDPE LF 172 34.50 172.00 5,934.00 172.00 5,934.00 <br /> 10 18~ CONCRETE SURGE BASIN EA 1 1,000.00 1.00 1,000.00 1.00 1,000.00 -. <br /> 11 IS" HOPE APRON EA 1 120.00 1.00 120.00 1.00 120.00 <br /> 12 27" DIAMETER, CATCH BASIN EA 2 1,370.00 2,00 2,740.00 2,00 2,740.00 <br /> IJ STANDARD MANHOLE (48") EA 1 2,785.00 1.00 2,785.00 1.00 2,785.00 <br /> 520064# I.XLS PAGE 1 520-064-30 I <br /> I <br />