Laserfiche WebLink
<br /> I . <br /> I - lil.' - <br /> SCHEDULE 4.0 - ~RM SEWER <br /> I 1 12" HDPE LF 5 J().OO 0.00 0.00 11.00 330,00 <br /> 2 IS" HDPE LF 270 20.00 0.00 0,00 260.00 5,200,00 <br /> 3 GRANUl.AJl. FOUNDATION TON 47 20.00 0.00 0.00 95.00 1,900.00 <br /> I . INSTALL CATCH BASIN EA 2 600.00 0,00 0.00 2.00 1.200,00 <br /> 5 INSTALL MANHOLE EA I 1.500.00 0.00 0.00 1.00 1.500.00 <br /> 6 INSTALL IS. SURGE BASIN EA 1 300,00 0,00 0.00 1.00 300.00 <br /> I 7 GROUTED RlP.RAP CY 14 60.00 0.00 0,00 10,00 600,00 <br /> T SCHEDULE 4.0 . STORM SEWER TOTAL 0.00 11.030.00 <br /> I SCHEDULE 5.0.11JRF ESTABLISHMEI<r ALT. A <br /> I SOD WI." TOPSOIL SY 12000 1.60 810.00 1.296.00 12.000.00 19.200,00 <br /> I 2 SEEDING WI MULCH (SEE MIXTURE 400) AC 8.5 800.00 0.00 0,00 7,06 5.648.00 <br /> T SCHEDULE 5.0.11JRF ESTABLlSHMENT ALT. A TOTAL 1.296.00 24.848.00 <br /> I SCHEDULE 6.0 ALT. BID ITEM .11JRF IRRIGATION SYSrEl\f <br /> I TURF IRRIGATION SYSTEl\f LS 1 34.000,00 0.00 0,00 1.00 34.000,00 <br /> -- T SCHEDULE 6.0 ALT. BID ITEl\(.11JRF IRRIGATION SYSrEl\f TOTAL 0.00 34.000.00 <br /> I SCHEDULE 7.0 - L1Gl1TING <br /> I FIELD L1GIlTlNG LS 1 49,000.00 0.00 0,00 1.00 49.000.00 <br /> I T SCHEDULE 7.0 - L1Gl1TING TOTAL 0.00 49,000.00 <br /> SCHEDULE 7.1- L1Gl1TING ALl'ERNAn;:s <br /> I I PARKING LOT L1GIITS EA 2 1.400,00 0.00 0.00 2.00 2.800,00 <br /> 2 WOOD POLE DEDUCTION LS I (1.400.00) 0,00 0,00 0.00 0.00 <br /> I T SCHEDULE 7.1 - L1Gl1TING ALTERNAn;:s TOTAL 0.00 2,800.00 <br /> SCHF:nm.F. II 0 CH A Nr.F. ORDF:R NO 1 <br /> I 1 WATER SERVICE REPLACEMENT LS I 2.510.00 0.00 0.00 1.00 2.510.00 <br /> 2 UTILITY REPAIRS LS 1 973.00 0.00 0.00 1.00 973,00 <br /> 3 SLOPE MODIFICATIONS LS 1 2.soo,oo 0.00 0,00 1.00 2.500.00 <br /> I T SCHEDULE 8.0 CHANGE ORDER NO. I-TOTAL 0,00 5.983.00 <br /> I TOTAL AMOUNT THIS PERIOD 11.786.30 <br /> TOTAL AMOUNT TO DATE 314.495.95 <br /> - <br /> .- <br /> I 520054#5.XLS PAGEl 51Q-.0S4-3Q <br />