Laserfiche WebLink
<br /> ~ I <br /> fl"IfAL PAntE.vr ESI1MATE ': <br /> NO. 21FINAL) <br /> FROM: MAY 4,1996 <br /> TO: JULY 15. 1996 <br /> CONTRACFOR: JAY BROTHERS, INC. I <br /> ADDR.E.SS: 9218 LAKE DRIVE N.E.. FOREST LAKE. MN lS02S <br /> OMol~ CITY OF ARDEN HilLS. MINNESOTA <br /> PROJECT: 1m STORM WATER IMPROVEMENTS (S2Q..064..30) I <br /> COMPLETION DATE AMOtINT OF CONTRACT: <br /> ORlGINAL: JULY 15. 1996 ORIGINAL: S 54.466.00 I <br /> REVISEIr. REVISED: <br /> tl,lllllltlil11i.II[,,1itillill.,Jlll III. I..~ I <br /> SCRF.nm.F. 1 /) 1 J.1nl' .JOSEPHlNF. nrm.F.T I <br /> 1 MUCK EXCAVATION CY 20 10,00 0.00 0.00 20.00 200.00 <br /> 2 PAVEMENTREMQVAL SY 60 2.00 0.00 0.00 66.00 132.00 I <br /> 3 REMOVE CMP IF 96 26.00 0.00 0.00 96,00 2.496.00 <br /> 4 REMOVE CMP FES EA 4 50.00 0.00 0.00 4.00 200.00 <br /> 5 J<j" ARCH PIPE (Cl 1lA) IF 60 188.00 0,00 0.00 60,00 11,280.00 '1 <br /> 6 36' ARCH RCP FES. WISAFETY GUARD EA 4 1.200.00 0.00 0,00 4.00 4.800,00 <br /> 7 FOUNDATION MATERIAL CY 20 20.00 16.00 320.00 J<j,00 720.00 <br /> 8 COMMON BORROW CY 7 15.00 7.00 105.00 7.00 105.00 I <br /> 9 DITCH GRADING CY 4 15.00 4,00 60.00 4.00 60.00 <br /> 10 RIP RAP, CLASS III. GROlITED CY 22 60.00 22,00 1.320.00 22.00 1.320.00 <br /> II SEEDING AC 0,5 2.000.00 0.50 I,(J(X).OO 0.50 1.000.00 I <br /> 12 WOOD RBER BLANKET - HIGH VELOCITY SY 250 5.00 250.00 1,2S0.00 250,00 '.250.00 <br /> 13 SILT FENCE - HEAVY DU1Y IF 120 3.00 40,00 120,00 40.00 120.00 <br /> 14 BITUMINOUS PATCH SY 60 16.00 60.00 960.00 60.00 960,00 I <br /> 15 4- EQUIV. WIDTH STRIPING. YELLOW LF 80 1.00 40.00 40.00 40.00 40.00 <br /> 16 4" EQUlV. WIDTH srRlPING. WHITE IF 80 1.00 0.00 0.00 0.00 0,00 <br /> T SCHEDli'LE 1.9 LAKE JOSEPHINE Oli7LET-TOTAL 5.175.00 24.683.00 I <br /> Sf:HF.n1JT.F. 2.0 KARTR J.tlC'F. RAVTNF. . <br /> 1 MUCK EXCA VA TlON CY 50 18,50 50,00 925.00 50.00 925.00 <br /> 2 DITCH GRADING (P) CY 30 15.00 30.00 450.00 30.00 450.00 <br /> 3 REMOVE tr HOPE IF II 5,00 0.00 0.00 11.00 55.00 I <br /> 4 BALE CHECKS EA 8 145.00 0,00 0.00 8.00 1,160.00 <br /> 5 SILT FENCE LF 400 3.00 150.00 450.00 250.00 750.00 <br /> 6 CHECK DAM EA 3 760.00 3,00 2,280.00 3.00 2,280,00 eI <br /> 7 lr HOPE LF 26 74.00 0.00 0.00 26.00 1.924.00 <br /> 8 12 a HOPE APRON EA 1 100.00 0.00 0.00 1.00 100.00 -I <br /> 9 18 - HDPE LF 172 34.50 0.00 0.00 172.00 5,934.00 <br /> .0 18- CONCRETE SURGE BASIN EA 1 1,000,00 0.00 0.00 1.00 1,000.00 <br /> 11 IS- HOPE APRON EA 1 120.00 0,00 0,00 1.00 120.00 . <br /> Jl;\c:IcricaI\j~1h::la:1\52OCl6&1:!.Xl.S PAGE 1 520-064-30 <br />