<br />l' ....
<br /> SCHEDULE 2.0 SITEWORK
<br /> I 2021.501 MOBILIZATION LS I 7,000.00 0 0.00 1.00 7,000.00
<br />. 2 2101.502 CLEARING & GRUBBING TREE 40 90.00 0 0.00 18.00 1,620.00
<br /> 3 2105.525 TOPSOil BORROW. CV CY 980 8.10 0 0.00 1,258.00 10,189.80
<br /> 4 0422.602 RETAIN. WALL - MODULAR CONe. BLOCK SF 1050 10.50 0 0.00 1,349.00 14.164.50
<br />I 5 2571.502 FURNISH AND PLANT SHADE TREE TREE 3 215.00 1 215.00 1.00 215.00
<br /> 6 2571.501 FURNISH AND PLANT EVERGREEN TREE 27 110.00 0 0.00 8.00 880.00
<br /> 7 2571.505 FURNISH AND PLANT SHRUB SHRUB 6 26.S0 5 132.50 8.00 212.00
<br /> 8 2573.503 SILT FENCE PREASSEMBLED LF 250 2.75 559 1,537.25 759.00 2.087.25
<br />I 9 2573.501 BALE CHECKS EA 18 1:5.00 0 0.00 31.00 465.00
<br /> 10 2575.501 SEED[NG AC 4.25 7lOJlO 0 0.00 0.00 0.00
<br /> 11 2575.505 SODDING, TYPE LAWN & BOULEVARD SY 9500 1.45 5296 7,679.20 13,296.00 19,279.20
<br />I 12 2575.523 WOOD FIBER BLANKET, TYPE REGULAR SY 1000 1.30 200 260.00 920.00 1.196.00
<br /> 13 2575.523 WOOD FIBER BLANKET, TYPE HIGH VELOCITY SY 500 1.70 0 0.00 0.00 0.00
<br />I T SCHEDULE 2.0 SIlEWORK-TOTAL 9,823.95 57,308.75
<br /> SCHEDULE 3.0 STORM SEWER
<br /> I 2101.502 CLEARING & GRUBBING TREE 3 215.00 0 0.00 1.00 215,00
<br />I 2 2104.501 REMOVE CONCRETE CURB LF 20 2.50 0 0.00 20.00 50.00
<br /> 3 2104.501 REMOVE Rep PIPE LF 625 6.35 0 0.00 500.00 3,175,00
<br /> 4 2104.501 REMOVE CMP PIPE LF 445 3.25 0 0.00 400.00 1,300.00
<br />.. 5 2104.509 REMOVE MANHOLE EA 4 425.00 0 0.00 3.00 1,275,00
<br /> 6 2104.509 REMOVE CATCH BASIN EA 5 425.00 0 0.00 5.00 2,125.00
<br /> 7 2501.567 15" Rep APRON EA 3 350.00 0 0.00 1.00 350.00
<br /> 8 2501.567 15" Rep SAFETY APRON & GRATE EA 2 650,00 0 0.00 3.00 1.950.00
<br />I 9 2501.567 18" Rep SAFETY APRON & GRATE EA 2 650.00 0 0.00 3.00 1,950.00
<br /> 10 2501.567 21" RCP APRON EA 3 440.00 0 0.00 4.00 1,760.00
<br /> 11 2502.501 4 ~ PERFORATED HOPE PIPE DRAIN WITH LF 7100 2.90 0 0.00 7,763.00 22.512.70
<br />I TYPE I GEOTEXTILE SOCK
<br /> 12 2506.509 DRAIN TILE CORE CONNECTIONS EA 31 175.00 0 0.00 17.00 2.975.00
<br /> 13 2503.511 30~ Rep PIPE Cl III LF 260 41.00 0 0.00 276.00 11,316.00
<br /> 14 2503.51l 27" RCP PIPE Cl III LF 262 37.25 0 0.00 259.00 9,647.75
<br />I 15 2503.511 21M RCPPIPE CL III LF 786 28.20 0 0.00 533.00 15,030.60
<br /> 16 2503.511 18" RCP PIPE CL V LF 1056 25.25 0 0.00 725.00 18,306.25
<br /> 17 2503,511 15" Rep PIPE CL V LF 477 23.30 0 0.00 274.00 6,384.20
<br />I 18 2503.511 12" RCP PIPE CL V LF 410 23,00 0 0.00 703.00 16,169.00
<br /> 19 2500.511 18" ARCH RCP PIPE Cl III LF 110 35.25 0 0.00 29.00 1,022.25
<br /> 20 2503.511 18" RCP PIPE CL III. 7-112 deg. BEND EA 1 160.00 0 0.00 1.00 160.00
<br />I 21 2503.511 15" CMP PIPE LF 25 20.25 0 0.00 0.00 0.00
<br /> 22 2503.511 12" CMP PIPE LF 35 20.00 0 0.00 35.00 700.00
<br /> 23 2506.:508 CONSTRUCT MANHOLE, STORM 48" DIA, EA 9 990.00 0 0.00 13.00 12.870.00
<br /> 2' 2506.50S CONSTRUCT MANHOLE, STORM 60" D1A. EA 5 1.500.00 0 0.00 4.00 6.000.00
<br />I 25 2506.50S CONSTRUCT MANHOLE. STORM 72" DIA. EA I 2,150.00 0 0.00 1.00 2,150.00
<br /> 26 2506.506 CONSTRUCT MANHOLE EXTRA DEPTH LF 4.5 90.00 0 0.00 1.88 169.20
<br /> 27 2506.509 CONSTRUCT CATCH BASIN. 27" DlA EA 4 760.00 0 0.00 5.00 3,800.00
<br />I 28 2506.509 CONSTRUCT CATCH BASIN. 24" x 36" EA 16 890.00 0 0.00 16.00 14,240.00
<br /> 29 2506.509 CONSTRUCT SHALLOW CATCH BASIN. 24~ x 36" EA 3 900.00 0 0.00 2.00 1,800.00
<br /> 30 2506.5]1 RECONSTRUCT MANHOLE EA 8 475.00 0 0.00 7.00 3,325.00
<br />i' 31 2506.522 ADJUST FRAME AND RING CASTING EA 7 270.00 2 540.00 9.00 2,430.00
<br /> 32 2511.501 RANDOM RIP RAP, CLASS 3 CY 35 65.00 0 0.00 49.55 3,220.75
<br /> 33 2573,602 INLET PROTECTION EA 33 37.50 0 0.00 0.00 0.00
<br />I T SCHEDULE 3.0 STORM SEWER-TOTAL 540.00 168,378.70
<br /> 5200S2#5.XLS Page 2 520-052.30
<br />
|