Laserfiche WebLink
<br /> I <br /> I <br /> ,. <br /> I 22 18' RCP SAFETY APRON EA 1 682,00 0,00 0,00 LOO 682.00 <br /> 23 CONSTRUCT CATCH BASIN, 24" x 36" EA 2 9]5.00 0,00 0,00 2,00 1,870.00 <br /> 24 ADJUST FRAME AND RING CASTING EA 3 125.00 3,00 375.00 3,00 375.00 <br /> I 25 ADJUST HYDRANT AND VALVE BOX EA I 550.00 0,00 0,00 0,00 0,00 <br /> 26 ADJUST VALVE BOX EA I 75.00 LOO 75.00 LOO 75.00 <br /> SCHEDULE 4.0 McCRACKEN LANE -TOTAL 15,823.37 28,056.27 <br /> I SCHF.DULE 5 0 RlDGEWOOD COURT <br /> 1 COMMON EXCAVATION (P) CY 110 5,00 120.00 600,00 120.00 600,00 <br /> I 2 SUBGRADE EXCA V AnON CY 95 4.45 0,00 0,00 0,00 0,00 <br /> 3 SELECT GRANULAR BORROW. CV CY 95 7,00 0,00 0,00 0,00 0,00 <br /> 4 SUBGRADE PREPARATION RDSTA 8,3 150.00 8.30 1,245.00 8.30 [,245.00 <br /> I 5 TOPSOil BORROW - CY CY 11 6,00 0,00 0,00 0,00 0,00 <br /> 6 AGGREGATE BASE .- CLASS SA TN IS to.OO 0,00 0,00 0,00 0,00 <br /> 7 MILLED BITUMINOUSJSALVAGED CLASS 5 CY 195 [6.10 195.00 3,139.50 195.00 3,(39.50 <br /> I 8 MILL BITUMINOUS SURFACE SY 180 1,00 341.00 6S2,QO 341.00 682.00 <br /> 9 TYPE 41A BITUMINOUS WEAR COURSE TN 165 14,00 205.00 4,920.00 205.00 4,920.00 <br /> 10 TYPE 31B BITUMINOUS BASE COURSE TN 145 23.00 197.85 4,550.55 197.85 4.550.55 <br /> 11 2" BlTIlMINOUS DRIVEWAY PAVEMENT SY 50 10.00 0,00 0,00 0,00 0,00 <br /> Ie 11 BITUMINOUS FOR TACK COAT GAL 80 1.00 80.00 80.00 80.00 80,00 <br /> 13 BITUMINOUS BERM LF 1760 0.75 0,00 0,00 0,00 0,00 <br /> 14 SODDING. TYPE LAWN & BOULEVARD SY 175 1.47 0,00 0,00 0,00 0,00 <br /> I SCHEDULE 5.0 RIDGEWOOD COURT-TOTAL 15,217.05 15,217.05 <br /> I SCHEDULE 6.0 LAMRTTI cmCI R SRAI COA.T <br /> 1 B1TUMrNOUS MATERIAL, CRS-2 GAL 390 0.91 390.00 354.90 390.00 354.90 <br /> 1 FA-2, CL.C., AGGREGATE TON 19 19.25 17.00 327.25 ]7.00 327.25 <br /> 3 CRACK SEAL LF 190 0.62 0,00 0,00 240.00 148.80 <br /> I SCHEDULE 6_0 LAMETfI CIRCLE SEAL COAT-TOTAL 682.l5 830.95 <br /> I SCHRom F. 7 0 LAMRTTI LANF ~FAT COAT <br /> 1 BITUMrNOUS MATERIAL, CRS-2 GAL 875 0.91 875.00 7%.25 875.00 796.25 <br /> 1 FA-2, CL.C., AGGREGATE TON 44 19.25 39.00 750.75 39.00 750.75 <br /> I 3 CRACK SEAL LF 360 0.62 0,00 0,00 450.00 279.00 <br /> SCHEDULE 7.0 LAMETrI LANE SEAL COAT-TOTAL 1,547.00 1,826.00 <br /> I SCHEDlIl F. g 0 FERNWOOD ROAD SFAI COAT <br /> 1 BITUMINOUS MATERIAL, CRS-2 GAL 195 0.91 295.00 268.45 295.00 268.45 <br /> 1 FA-2, CL.C.. AGGREGATE TON 15 19.25 13.00 250.25 13.00 250.25 <br /> I 3 CRACK SEAL LF 180 0,62 0,00 0,00 225.00 139.50 <br /> f' SCHEDULE 8.0 FERNWOOD ROAD SEAL CQAT-TOTAL 518.70 658.20 <br /> I n: \clerical\520\520068N2. XLS 520-068-30 <br /> PAGE 4 <br />