My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-28-1996
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1996
>
CCP 10-28-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:12:59 PM
Creation date
11/10/2006 3:12:44 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />~- CITY OF ARDEN HILLS <br /> MEMORANDUM <br />I DATE: October 25, 1996 <br />I TO: Brian Fritsinger, City Administrator <br />I FROM: Dwayne Stafford, Public Works Superintendent <br /> V.~. <br /> SUBJECT: Monthly Dept. Head Report <br />I PW/PS Committee: <br /> The Public Works/Public Safety Committee has elected to meet every other month and did <br />I not meet in October. Members were invited to attend a tour of the Arden Hill south tower, booster <br /> station and an underground lift station. The tour was given, however only 1 committee member <br /> attended. <br />I PW Department <br />I The PW Dept did one final street sweep of the worst areas this past month and put the <br /> sweeper away for the winter along with the majority of the summer equipment. Plows were taken <br /> out of storage and trucks are being readied for winter. <br />.. The flushing of the water system was completed during the 1st two weeks of October and <br /> went well. <br /> The cily purchased 24 hydrant markers and the maintenance men are installing them on hard <br />I to spot hydrants and those hydrants on the portion of Hamline Avenue where County plows, <br /> unfamiliar with the area, will take over snow removal. <br /> Three broken off hydrants have been identified and one has been repaired. <br />I Flushing of known trouble areas in the sanitary sewer system is being done as time permits. <br /> The new City Plow Truck is expected in next month however it may be February before Box <br /> and Plow equipment are built and installed. The dept. expects to rearrange the plow routes at this <br />I time to put thc big rigs on the main streets and the smaller trucks on the side streets. Currently each <br /> truck is assigned an area verses a route. <br />I 1996 Street Improvements <br /> As of 10-24-96 it appears that the 1996 street work is substantially finished. All that <br />1 remained was some black dirt and sodwork and reinstall the mail boxes and those items are being <br /> completed this week. <br /> The PW Dept. feels the cily got a better job this year \vith less problems, however the Public <br />I Works Superintendent has asked the city engineer if we can put more teeth into the completion date <br /> to insure contractors remain on the job. <br />I 1997 Street Improvements <br /> The City Engineer met with staff this week and is nearing completion on the 1997 Street <br />" Improvement feasibility study. Council can expect to see a resolution supporting this study and a <br /> resolution asking for a public hearing on the 1997 Street Improvement Plan at its Nov. 12th meeting. <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.