Laserfiche WebLink
<br /> ~ rllVUOJ.U\"'1"'_" <br />I l ENGINEERING SUBSURFACE BOIDNG LOG <br /> TESTING, INC. <br /> AET JOB NO: 96-2601 LOG OF BORING NO, 11 (P. 1 of 1) <br /> PROJECT: 1997 Street Reconstruction Projects; Arden Hills, MN <br /> DEPTII SURFACE ELEV AnON: GEOLOGY SAMPLE REC, FIELD & LABORATORY TEST' <br /> IN N MC TYPE IN, <br /> FEET MATERIAL DESCRlPTION WC DEN LL PL %.200 <br /> 2" Bituminous pavement - * M = DS <br />, I 2" Base, old bituminous pavement 'l< TOPSOIL M '- DS <br /> Clayey sand, black (SC) (A-4) ," M DS 44 <br /> ," <br /> 2 - Silty sand, fme grained, dark brown to COARSE <br />I , ALLUVIUN <br /> brown, moist (SM) (A-4) " <br /> 3 M DS 20 <br /> Lean clay, brown (CL) (A-6) FINE <br />I 4- ALLUVIUM <br /> END OF BORING <br />I Location: North Snelling Avenue Service *FILL <br /> Road, 5'W of C/L, 248'N (along <br /> C/L) of Arden Place CIL <br />I <br />, <br />Ie <br />I <br />, <br />I <br />I <br />I <br />I DEPTIl: DRILLING METIlOD WATER LEVEL MEASUREMENTS NOTE: REFER TO <br />I TIME SAMPLED CASING I CAVE-IN DRILLING WATER TIlE A TI ACHED <br /> 0-4.5' 4"FA DATE DEPTIl DEPTIl DEPTIl FLUID LEVEL LEVEL <br /> 10-14-96 8:55 4.5 NONE SHEETS FOR AN <br /> - <br />,- I EXPLANATION OF <br /> BORL'IG TERMINOLOGY ON <br /> COMPLETED: 10/14/96 <br /> CA: VD TIllS LOG <br /> CC: DA Ri., 7 <br />I 4/90 <br />