My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
307
ArdenHills
>
Administration
>
City Council
>
Ordinances
>
1990-1999
>
1998
>
307
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2021 3:42:32 PM
Creation date
11/10/2006 3:17:13 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> EXHIBIT A - Continued <br /> <br /> <br /> incorporate status monitoring at nodes and strategic locations. . <br /> <br /> • A- 6. Non-interruptible power-passing compatible taps are planned for ease of <br /> maintenance and less disruption during system maintenance. <br /> <br /> • A- 7. Adequate fiber count, a minimum of 16 per initial 2,000 home node, will be <br /> included in order to facilitate future expansion of needs including future expansion of <br /> needs in business corridors as commercial need dictates. <br /> <br /> • A- 8. The subscriber RF system will accommodate and be capable of providing return <br /> signals in 5- 40 MHZ bandwidth in the future. Such return capacity will be activated as <br /> commercial and marketplace need dictates and with mutually acceptable franchise <br /> languaae that establishes a mechanism for discussions regarding the activation of the <br /> return. <br /> <br /> • A- 9. All existin; head end equipment will be replaced with state-of-the-art standard <br /> . frequency head end equipment. <br /> <br /> • . A- 10. Basic Service channel mappinor will no longer be utilized by the system, thereby <br /> permittin~ all local VHF off-air broadcast signals to be located "on-channel" for all <br /> customers and with no impact on the PEG channel location on Universal Service. <br /> <br /> • A- 11. Standby power will continue to be in place for the head end. <br /> <br /> • A- 12. The system will have the capability to receive and pass through all local broadcast <br /> sijnals in diaital farmat as required by applicable federal rules and recrulations and in <br /> compliance with applicable FCC mandated time lines. <br /> <br /> • A- 13. The system will permit all channels available to Meredith Cable in stereo to be <br /> passed through in stereo. <br /> <br /> • A- 14. Meredith Cable will commence application for licenses and permits related to <br /> construction within 90 days after the commencement of the renewal period. <br /> <br /> • A- 15. Meredith Cable will commence desijn, walkout, etc. related to construction <br /> within 90 days after commencement of the renewal period. <br /> <br /> • A- 16. Meredith Cable proposes to enter into a franchise timetable to complete the <br /> , project by November 30, 2000 and will aggressively work to substantially complete <br /> construction by November 30, 1999. Meredith Cable will carefully map and report any <br /> underground pIant that may be abandoned. Stand aione abandoned aerial cable will be <br /> removed. <br /> <br /> <br /> <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.