Laserfiche WebLink
<br /> <br /> <br /> <br /> EXHIBIT D - <br /> <br /> <br /> NORTH SUBLTT_2BAN I-NET PF,RFORMANCE STANDAR1)S <br /> <br /> Upon completion of the I-Net upgirade: <br /> <br /> I. Video Transmission <br /> A. Video transmission will comply with the following performance : <br /> standards: <br /> 1. Carrier to noise ratio = 45dB or better <br /> 2. Carrier to composite triple beat = 53dB or better <br /> 3. Carrier to composite second order = 55 dB or better <br /> 4. Carrier to cross modulation = 55 dB or better <br /> 5. System signal level variations (peak to valley) = n= 10 + 2 or better <br /> for all cowual cable portions of the I-Net (where N= the number of <br /> amplifiers in cascade). <br /> B. Testing will occur twice yearly following the timing established in CFR <br /> 76.601 and 76.605. <br /> 1. From the institution to the longest subscriber cascade. <br /> 2. From the institution through the applicable headend/ hub site <br /> returning back to the same institution. <br /> 3. Performed using existing I-Net carriers active at the time of the <br /> testing, wtuch will subject them to service interuptions. <br /> 4. Completeci at Company-designated entry demarcation point at the <br /> institution. <br /> 5. The systern will meet calcnlated worst case fully loaded video and <br /> audio mea.surements, taking into consideration existing I-Net data <br /> loading at the time the measurement is taken. <br /> 6. Under ordGnary operating conditions. <br /> 2. Digital Transmission <br /> A. For I-Net that is 50% or more coaxial cable, a Bit Error Rate of 1 x 10(-8) at <br /> the demarcation point. <br /> 1. Outage tunes not included <br /> 2. Ordinary operating conditions <br /> B. For I-Net that is 50% or more fiber optic cable, a Bit Error Rate of 1 x 10(- <br /> 9) at the demarcation point. <br /> 1. Outage thnes not included <br /> 2. Ordinary operating conditions <br /> C. For both coaxial ;and fiber network, the company will meet or exceed a <br /> reliability factor of 99.965% on an annual basis. <br /> <br /> D. Testing will occux twice yearly, during the months of January/February and <br /> July/August. <br />