My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-24-25-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
11-24-25-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2025 1:52:02 PM
Creation date
11/21/2025 1:40:12 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
based on the following findings: findings to deny should specifically reference the reasons <br />for denial and why those reasons cannot be mitigated. <br />• Table: Motion to table Planning Case 25-008 for a lot consolidation and variances for lot <br />area, lot depth, front yard and rear yard setbacks, impervious surface coverage, structure <br />coverage, and floor area ratio, to construct a new single-family dwelling at 1622 Lake <br />Johanna Blvd: a specific reason and information request should be included with a motion <br />to table. <br />Notice <br />Although a variance does not require a public hearing, a public meeting notice was prepared by <br />the City and mailed to properties within 500 feet of the Subject Property on August 22, 2025. A <br />public meeting notice for this planning case was published in the Pioneer Press. Minnesota statute <br />does not clearly require a public hearing before a variance is granted or denied, however, after <br />consulting with the City Attorney, staff agree that the best practice is to allow public forum on all <br />variance requests. A public forum allows the city to establish a record and elicit facts to help <br />determine if the application meets the practical difficulties factors. <br />The City has not received any public comments regarding this planning case. <br />Deadline for Aiency Actions <br />The City of Arden Hills received the completed application for this request on August 11, 2025. <br />Pursuant to Minnesota State Statutes Section 15.99, the City must act on this request by October <br />9, 2025 (60 days) unless the City provides the petitioner with written reasons for an additional 60- <br />day review period. <br />Attachments <br />A. <br />Land Use Application <br />B. <br />Location Map <br />C. <br />Applicant Narrative <br />D. <br />Existing Site Survey <br />E. <br />Proposed Site Survey <br />F. <br />Architectural Plans <br />Page 14 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.